My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE_1997
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
P
>
PACIFIC
>
0
>
2900 - Site Mitigation Program
>
PR0506203
>
SITE INFORMATION AND CORRESPONDENCE_1997
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/31/2020 3:10:36 PM
Creation date
3/31/2020 2:32:26 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
FileName_PostFix
1997
RECORD_ID
PR0506203
PE
2960
FACILITY_ID
FA0007271
FACILITY_NAME
LINCOLN CNTR ENV REMEDIATION TRUST
STREET_NUMBER
0
STREET_NAME
PACIFIC
STREET_TYPE
AVE
City
STOCKTON
Zip
95207
CURRENT_STATUS
01
SITE_LOCATION
PACIFIC AVE
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
310
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
LAine•Fricke•Recon <br /> ENGINEERS,HVDROGEOLOGISTS 8 APPLIED SCIENTSTS <br /> • The Quarterly Groundwater Monitoring Report for October 1 through December 31, 1996 (the <br /> fourth quarter 1996) was issued on February 14, 1997. <br /> • The Phase I IRA Field Scoping Activities Interim Report was issued to all parties on March 7, <br /> 1997. <br /> • The following revisions to the "Work Plan for Environmental Investigation, Lincoln Center, <br /> Stockton, California," dated September 23, 1996, were issued as follows: <br /> 1. Quality Assurance Project Plan (Appendix C), Revision 1, February 21, 1997 <br /> 2. Quality Assurance Project Plan (Appendix C), Revision 2, March 21, 1997 <br /> 3. Field Sampling Plan (Appendix B), Revision 1, March 21, 1997 <br /> • The draft Public and Private Well Survey report was submitted to the RWQCB, SIC <br /> PHS/EHD, SJC DPW, and the City of Stockton Department of Municipal Utilities for their <br /> review on March 13, 1997. <br /> The next bimonthly letter report will be issued in June 1997. Please contact me if you have any <br /> questions or comments. <br /> Sincerely, <br /> Donald T. Bradshaw, R.G. <br /> Principal Hydrogeologist <br /> Site Project Manager <br /> Attachment <br /> cc: Distribution List <br /> 4111-A97.BMM:SRL 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.