My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE_1997
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
P
>
PACIFIC
>
0
>
2900 - Site Mitigation Program
>
PR0506203
>
SITE INFORMATION AND CORRESPONDENCE_1997
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/31/2020 3:10:36 PM
Creation date
3/31/2020 2:32:26 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
FileName_PostFix
1997
RECORD_ID
PR0506203
PE
2960
FACILITY_ID
FA0007271
FACILITY_NAME
LINCOLN CNTR ENV REMEDIATION TRUST
STREET_NUMBER
0
STREET_NAME
PACIFIC
STREET_TYPE
AVE
City
STOCKTON
Zip
95207
CURRENT_STATUS
01
SITE_LOCATION
PACIFIC AVE
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
310
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
LnleyJ,�Ifricke-Recon <br /> T� , OLOGISTS&APPLIED SCIENTISTS <br /> April 11, 1997 91 RR 15 PM 12* 25 4111.03-004 <br /> via fax and U.S. mail <br /> Mary Meays, R.E.H.S. <br /> San Joaquin County Public Health Services <br /> Environmental Health Division <br /> 304 E. Weber Avenue, Third Floor <br /> P.O. Box 388 <br /> Stockton, California 95201-0388 <br /> Subject: Notification of Continuation of Well Permit for Cone Penetrometer Testing Borings, <br /> Lincoln Center, Stockton, California <br /> Dear Mary: <br /> Levine.Fricke•Recon Inc. (LFR) will be conducting additional cone penetrometer testing (CPT) <br /> and push-in polyvinyl chloride (PIPP) sampling as a continuation of the source investigation at <br /> Lincoln Center. We will be installing CPT/PIPP borings using the same subcontractor, Gregg <br /> In-Situ, Inc., on two parcels where permits have been previously issued and on one parcel where <br /> we are currently waiting for property access approval from private parties. This letter provides <br /> notification that we are continuing the following permits: <br /> E <br /> umber Parcel Number Owner Status <br /> nding 097-41-29 Payless Pending access approval from the owner <br /> 097-41-73 Lincoln Properties, Ltd. Pending access approval from the owner <br /> 097-41-79 Lincoln Properties, Ltd. Pending access approval from the owner <br /> We have attached a copy of the two previously issued permits and the permit application for your <br /> convenience. We anticipate beginning the CPT/PIPP investigation on April 28, 1997. We will <br /> notify you 48 hours before the installation of each boring to schedule grout inspections. <br /> If you have any questions or comments, please call me. <br /> Sincerely, <br /> Sarah L. Raker, R.G., CHG. <br /> Senior Hydrogeologist <br /> Enclosures <br /> 1900 Powell Street, 12th Floor, Emeryville, California 94608-1827 • (510) 652-4500 • fax (510) 652-2246 • O//ices Worldwide <br />
The URL can be used to link to this page
Your browser does not support the video tag.