Laserfiche WebLink
Page 2 of 3 <br /> SVE-015: <br /> Tagged Depth—7 ft bgs <br /> PVC Conveyance piping and well head cut and removed. <br /> Well obstructed by sediment and grouting cannot be performed <br /> SVE-012: <br /> Tagged Depth—14 ft bgs <br /> PVC Conveyance piping and well head cut and removed. <br /> Well obstructed by sediment and grouting cannot be performed <br /> SVE-009: <br /> Tagged Depth—27.0 ft bgs <br /> PVC Conveyance piping and well head cut and removed. <br /> 80 gallons of grout(mix ratio of 40 gallons water to 8 bags of cement) poured down the well to bring the grout <br /> to the top of casing. <br /> Well held a pressure of 20 psi for five minutes. <br /> 40 gallons of grout mix poured into well vault to bring grout up to 6 inches above the top of the 4" PVC casing. <br /> SVE-016: <br /> Tagged Depth—27.0 ft bgs <br /> PVC Conveyance piping and well head cut and removed. <br /> 80 gallons of grout(mix ratio of 40 gallons water to 8 bags of cement) poured down the well to bring the grout <br /> to the top of casing. <br /> Well held a pressure of 20 psi for five minutes. <br /> 40 gallons of grout mix poured into well vault to bring grout up to 6 inches above the top of the 4" PVC casing. <br /> SVE-010: <br /> Tagged Depth—27.0 ft bgs <br /> PVC Conveyance piping and well head cut and removed. <br /> 100 gallons of grout(mix ratio of 40 gallons water to 8 bags of cement) poured down the well to bring the grout <br /> to the top of casing. <br /> Well held a pressure of 20 psi for five minutes. <br /> 50 gallons of grout mix poured into well vault to bring grout up to 6 inches above the top of the 4" PVC casing. <br /> SVE-008: <br /> Tagged Depth—28.5 ft bgs <br /> PVC Conveyance piping and well head cut and removed. <br /> 50 gallons of grout(mix ratio of 40 gallons water to 8 bags of cement) poured down the well to bring the grout <br /> to the top of casing. <br /> Well held a pressure of 20 psi for five minutes. <br /> 45 gallons of grout mix poured into well vault to bring grout up to 6 inches above the top of the 4" PVC casing. <br /> I forgot to add two SVE vaults to the 9/11-9/12 Summary <br /> SVE-025: <br /> Tagged Depth—29 ft bgs <br /> PVC Conveyance piping and well head cut and removed. <br /> 70 gallons of grout(mix ratio of 40 gallons water to 8 bags of cement) poured down the well to bring the grout <br /> to the top of casing. <br /> Well held a pressure of 20 psi for five minutes. <br /> 10/9/2015 <br />