My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE_2008-2015
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
P
>
PACIFIC
>
0
>
2900 - Site Mitigation Program
>
PR0506203
>
SITE INFORMATION AND CORRESPONDENCE_2008-2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/31/2020 3:00:55 PM
Creation date
3/31/2020 2:41:07 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
FileName_PostFix
2008-2015
RECORD_ID
PR0506203
PE
2960
FACILITY_ID
FA0007271
FACILITY_NAME
LINCOLN CNTR ENV REMEDIATION TRUST
STREET_NUMBER
0
STREET_NAME
PACIFIC
STREET_TYPE
AVE
City
STOCKTON
Zip
95207
CURRENT_STATUS
01
SITE_LOCATION
PACIFIC AVE
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
184
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 2 of 3 <br /> AS-22: <br /> Overdrilled 9.26, but due to rig failure all casing pulled (including screen) and augers left sunk below grade and <br /> sealed until grouting on 10.02. <br /> Tagged Depth - 56 ft bgs <br /> / Total Depth Drilled—58 ft bgs <br /> Materials Removed—old cement grout,filter pack sand and 58 feet of casing including screen. <br /> Grout mix ratio-30 gallons of water with 8 bags of cement. <br /> Volume of grout used—approximately 120 gallons of grout tremmied down augers. <br /> 10.06.2015: <br /> AS-49: <br /> Tagged Depth- 70 ft bgs <br /> Total Depth Drilled—70 ft bgs <br /> Materials Removed—old cement grout,filter pack sand and 67 feet of casing excluding screen. <br /> Grout mix ratio-30 gallons of water with 8 bags of cement. <br /> Volume of grout used—approximately 175 gallons of grout tremmied down augers. <br /> AS-59: <br /> Tagged Depth- 69 ft bgs <br /> Total Depth Drilled—70 ft bgs <br /> / Materials Removed—old cement grout,filter pack sand and 25 feet of casing. <br /> Well casing centralizer jammed augers and guide rods(that rundown casing). Rig had to pull augers and guide <br /> rods and cover open borehole and will tremmie grout down open borehole on 10.07.2015. <br /> SV M W E-001: <br /> Tagged Depth- 29.5 ft bgs <br /> Total Depth Drilled—32 ft bgs <br /> Materials Removed—old cement grout,filter pack sand and 30 feet of casing including screen and bottom cap. <br /> Grout mix ratio-30 gallons of water with 8 bags of cement. <br /> Volume of grout used—approximately 110 gallons of grout tremmied down augers. <br /> SVE-034: <br /> Tagged Depth- 10 ft bgs (silted in): <br /> Total Depth Drilled—33 ft bgs <br /> Materials Removed—old cement grout,filter pack sand and30 feet of casing including screen and bottom cap. <br /> Grout mix ratio-30 gallons of water with 8 bags of cement. <br /> Volume of grout used—approximately 200 gallons of grout tremmied down augers. <br /> Please let me know if you have any questions. <br /> Thank you for your time. <br /> Sincerely, <br /> --Orin Regier <br /> 10/9/2015 <br />
The URL can be used to link to this page
Your browser does not support the video tag.