My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
P
>
PACIFIC
>
0
>
2900 - Site Mitigation Program
>
PR0506203
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/31/2020 3:09:22 PM
Creation date
3/31/2020 2:42:22 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0506203
PE
2960
FACILITY_ID
FA0007271
FACILITY_NAME
LINCOLN CNTR ENV REMEDIATION TRUST
STREET_NUMBER
0
STREET_NAME
PACIFIC
STREET_TYPE
AVE
City
STOCKTON
Zip
95207
CURRENT_STATUS
01
SITE_LOCATION
PACIFIC AVE
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
141
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
June 1996 • Page 3 <br /> DRAFT W• - • . will begin when the final Work Plan is issued.Written <br /> ENVIRONMENTAL INVESTIGATION comments or questions regarding the draft Work Plan may be <br /> directed to the Site Project Manager,Levine-Fricke,as <br /> To comply with the Court's orders to further investigate the follows: <br /> dry cleaning contamination at Lincoln Center,Levine-Fricke if by mail: <br /> has prepared and issued for public review and comment a Lincoln Center Project <br /> draft Work Plan. The draft Work Plan consists of five major c/o Donald T Bradshaw, R.G. <br /> elements: Levine-Fricke <br /> 1900 Powell Street, 12th Floor <br /> 1. a remedial investigation(RI)to fully characterize the Emeryville, California 94608 <br /> nature and extent of the dry cleaning contamination in <br /> soil and groundwater beneath and migrating from if by facsimile(fax): <br /> Lincoln Center Lincoln Center Project <br /> c/o Donald T Bradshaw, R.G. <br /> 2. a risk assessment(RA) to assess potential threats, if any, Levine-Fricke <br /> to human health and the environment that may be posed 1-510-652-4906 <br /> by the dry cleaning contamination <br /> A public meeting will be held June 19, 1996, at 6:30 p.m. at <br /> 3. a feasibility study (FS)to fully and completely consider, Zion Lutheran Church Social Hall, 808 Porter Avenue, <br /> develop, and analyze all potential appropriate remedial Stockton, to provide information to the public about the <br /> alternatives to clean up the dry cleaning contamination proposed activities described in the draft Work Plan. The <br /> in soil and groundwater beneath and migrating from Site Project Manager and representatives of the SDCDs, <br /> Lincoln Center LPL, and the RWQCB will be present at the meeting to <br /> 4. a treatability study (TS), if necessary and appropriate, to discuss the draft Work Plan, to respond to comments, and to <br /> obtain sufficient data to enable potential treatment receive questions from the public. <br /> alternatives to be fully identified and evaluated to In addition, a toll-free information number has been <br /> support the design of clean-up alternatives established to permit interested members of the public to <br /> 5. a remedial action plan (RAP), which will be prepared register to be on a mailing list to receive future mailings <br /> after completion of the RI,RA, FS, and TS, and which concerning the Lincoln Center project. The toll-free line <br /> will outline a specific program to clean up the dry will also permit interested members of the public to leave <br /> cleaning contamination brief comments or inquiries concerning the Lincoln Center <br /> Throughout implementation of the Work Plan,the SDCDs Project. <br /> will continually evaluate the need to perform Interim Removal The toll-free number is: 1-800-527-2215 <br /> or Remedial Actions(IRAs)prior to submittal of the RAP. <br /> IRAs are clean-up actions that may be taken during imple- GLOSSARY <br /> mentation of the Work Plan to protect public health and the <br /> environment while long term clean-up solutions are being dry cleaning contamination PCE and its associated <br /> developed. breakdown products TCE and 1,2-DCE that are present in <br /> soil and groundwater beneath Lincoln Center <br /> OPPORTUNITIES F• - groundwater Water present in spaces between individual <br /> PUBLIC INVOLVEMENT <br /> grains in the soil beneath the surface of the ground <br /> A document depository has been established at the Margaret monitoring well A groundwater well that is designed so <br /> Troke Branch of the Stockton Public Library,502 Benjamin groundwater samples can be collected and analyzed to <br /> determine the presence of chemicals; water levels can also <br /> Hol[Drive, Stockton, to provide an opportunity for the <br /> public to obtain more information about the environmental be measured in these wells <br /> investigation at Lincoln Center. The document depository municipal groundwater supply wells Wells, usually deep, <br /> will contain copies of all reports prepared for the Lincoln that are designed and installed to supply drinking water to <br /> Center project, including the draft and final versions of the the public in a specific area <br /> Work Plan, as well as this and future fact sheets. The draft <br /> and final work plan will also be available at the Stockton Regional Water Quality Control Board —Central Valley <br /> Main Library, located at 605 North EI Dorado, Stockton. Region(RWQCB)The principal governmental agency <br /> responsible for overseeing implementation of the Work Plan <br /> In addition,incompliance with Court orders,the draft Work <br /> Plan will be available for public comment from June 3 Public Health Services,San Joaquin County The local <br /> through July 5, 1996. The draft Work Plan will also be governmental agency that provides permits to drill monitor- <br /> submitted to the RWQCB and other regulatory agencies for mg wells and that oversees activities that could impact the <br /> comment.The draft Work Plan will be revised to address health and welfare of the local citizens and environment <br /> public and regulatory agency comments within 60 days of the <br /> close of the comment period.The majority of the field work Continued on page 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.