Laserfiche WebLink
• Section 10-lonstruction Details <br /> Standard Specifications Section 14 Special <br /> Page 8 of 7 <br /> The holes shall be backfilled with native soil after the grout <br /> has set. The soil shall be backfilled and compacted in layers and <br /> the surface graded to prevent settlement and the ponding of water. <br /> Backfill shall conform to the requirements of Section 19 , <br /> "Earthwork (Miscellaneous Areas) " of these Special Provisions. <br /> The three sites located in lawn areas shall have lawn damaged <br /> during destruction operations restored with turf (sod) as provided <br /> in Section 20, "Turf (Sod) " of these Special Provisions. Well site <br /> no. 4 shall be restored by backfilling as stated above; however, <br /> the surface shall remain native soil. <br /> The contract price paid for surface reparation shall include <br /> full compensation for furnishing all labor, materials, tools, <br /> equipment, and incidentals, and for doing all the work involved for <br /> complete reparation of the well site surfaces including backfill, <br /> compaction, grading, and turf installation where required. <br /> 669USPECMEMON.14 <br />