My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS_1990
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
P
>
PACIFIC
>
0
>
2900 - Site Mitigation Program
>
PR0506203
>
WORK PLANS_1990
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/31/2020 2:54:20 PM
Creation date
3/31/2020 2:44:24 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
FileName_PostFix
1990
RECORD_ID
PR0506203
PE
2960
FACILITY_ID
FA0007271
FACILITY_NAME
LINCOLN CNTR ENV REMEDIATION TRUST
STREET_NUMBER
0
STREET_NAME
PACIFIC
STREET_TYPE
AVE
City
STOCKTON
Zip
95207
CURRENT_STATUS
01
SITE_LOCATION
PACIFIC AVE
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• Section 10-lonstruction Details <br /> Standard Specifications Section 14 Special <br /> Page 8 of 7 <br /> The holes shall be backfilled with native soil after the grout <br /> has set. The soil shall be backfilled and compacted in layers and <br /> the surface graded to prevent settlement and the ponding of water. <br /> Backfill shall conform to the requirements of Section 19 , <br /> "Earthwork (Miscellaneous Areas) " of these Special Provisions. <br /> The three sites located in lawn areas shall have lawn damaged <br /> during destruction operations restored with turf (sod) as provided <br /> in Section 20, "Turf (Sod) " of these Special Provisions. Well site <br /> no. 4 shall be restored by backfilling as stated above; however, <br /> the surface shall remain native soil. <br /> The contract price paid for surface reparation shall include <br /> full compensation for furnishing all labor, materials, tools, <br /> equipment, and incidentals, and for doing all the work involved for <br /> complete reparation of the well site surfaces including backfill, <br /> compaction, grading, and turf installation where required. <br /> 669USPECMEMON.14 <br />
The URL can be used to link to this page
Your browser does not support the video tag.