My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS_2008-2014
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
P
>
PACIFIC
>
0
>
2900 - Site Mitigation Program
>
PR0506203
>
WORK PLANS_2008-2014
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/31/2020 2:59:40 PM
Creation date
3/31/2020 2:47:46 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
FileName_PostFix
2008-2014
RECORD_ID
PR0506203
PE
2960
FACILITY_ID
FA0007271
FACILITY_NAME
LINCOLN CNTR ENV REMEDIATION TRUST
STREET_NUMBER
0
STREET_NAME
PACIFIC
STREET_TYPE
AVE
City
STOCKTON
Zip
95207
CURRENT_STATUS
01
SITE_LOCATION
PACIFIC AVE
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
109
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
GeosyntecO <br /> consultants <br /> 5. REFERENCES <br /> ARCADIS U.S., Inc. (ARCADIS), 2010. Proposed Closure of the Phase II (Soil- <br /> Vapor Extraction) and Phase IV (Air and Ozone Sparging) Interim Remedial Actions, <br /> Lincoln Center, Stockton, California. August 17. <br /> Central Valley Regional Water Quality Control Board (CVRWQCB), 2011. Letter <br /> from Mr. Roberto Cervantes titled Comments on Lincoln Center SVE and Air Sparging <br /> Closure Report, Stockton, San Joaquin County, January 4. <br /> CVRWQB, 2013. Letter from Mr. Roberto Cervantes titled Soil Closure Report — <br /> Lincoln Village Shopping Center, Stockton, San Joaquin County. August 2. <br /> California Environmental Protection Agency (Cal/EPA), 2005. Use of California <br /> Human Health Screening Levels in Evaluation of Contaminated Properties. January. <br /> Environmental Data Resources (ERM) 2013. Groundwater Monitoring Report Semi- <br /> Annual Sampling—June 2013. August. <br /> Geosyntec, 2012a. Soil Closure Report, Lincoln Center, Stockton, California, July <br /> 2012. <br /> Geosyntec, 2012b. SVE System Optimization Testing and Confirmation Soil Sampling <br /> Work Plan,Lincoln Center, Stockton, California. 16 October. <br /> Geosyntec, 2013. Soil Closure Report,May 01. <br /> Levine-Fricke (LFR), 1999. Phase II Interim Remedial Action Detailed Plan, Lincoln <br /> Center, Stockton, California. May 14. <br /> LFR, 2000. Construction Completion and System Startup Report, Lincoln Center <br /> Stockton, California.April 25. <br /> LFR, 2007. Construction Completion and System Startup Report Phase IV Interim <br /> Remedial Action, October 5. <br /> LFR, 2009. Proposed Closure Plan for Phase II (Soil-Vapor Extraction) and Phase IV <br /> (Air and Ozone Sparging) Interim Remedial Actions, Lincoln Center, Stockton, CA, <br /> August 28. <br /> System Decommissioning and Well Destruction Work Plan 10 07/182014 <br />
The URL can be used to link to this page
Your browser does not support the video tag.