Laserfiche WebLink
Mr. Cervantes <br /> 16 October 2012 <br /> Page 5 <br /> results, the soil vapor sampling results, and other historic data. Following this meeting, <br /> Geosyntec will submit the final soil closure request to the CVRWQCB. <br /> Schedule <br /> Based on the scope of work described in this work plan, we anticipate conducting the SVE <br /> system optimization testing between October 25, 2012 and January 15, 2013. Immediately <br /> following the optimization testing, we will complete the confirmation sampling. We expect to <br /> have a meeting with the CVRWQCB to discuss the result of the testing in early February 2013 <br /> and to submit the closure request in early March 2013. <br /> Closin¢ <br /> We appreciate the opportunity to submit this Work Plan. Please contact me if you have any <br /> questions or would like further information. <br /> Since/rely, <br /> C <br /> Scott Forbess <br /> Senior Engineer <br /> Attachments: Figure 1 —Site Map <br /> Figure 2—Phase II IRA Soil-Gas Analytical Results,May 2010 and May 2012 <br /> Figure 3 —Phase II IRA Soil-Vapor Extraction System General Layout <br /> Copies to: Ken Baker, Chartis <br /> Dave Sadoff, Chartis <br /> Phil Johnson, Sims Grupe Management <br /> Joe Salazar, Lewis Brisbois Brisgaard& Smith LLP <br /> 20121000-SVE Optimization and Confirmation Testing <br /> engineers I scientists I innovators <br />