My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS_2008-2014
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
P
>
PACIFIC
>
0
>
2900 - Site Mitigation Program
>
PR0506203
>
WORK PLANS_2008-2014
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/31/2020 2:59:40 PM
Creation date
3/31/2020 2:47:46 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
FileName_PostFix
2008-2014
RECORD_ID
PR0506203
PE
2960
FACILITY_ID
FA0007271
FACILITY_NAME
LINCOLN CNTR ENV REMEDIATION TRUST
STREET_NUMBER
0
STREET_NAME
PACIFIC
STREET_TYPE
AVE
City
STOCKTON
Zip
95207
CURRENT_STATUS
01
SITE_LOCATION
PACIFIC AVE
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
109
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mr. Cervantes <br /> 16 October 2012 <br /> Page 5 <br /> results, the soil vapor sampling results, and other historic data. Following this meeting, <br /> Geosyntec will submit the final soil closure request to the CVRWQCB. <br /> Schedule <br /> Based on the scope of work described in this work plan, we anticipate conducting the SVE <br /> system optimization testing between October 25, 2012 and January 15, 2013. Immediately <br /> following the optimization testing, we will complete the confirmation sampling. We expect to <br /> have a meeting with the CVRWQCB to discuss the result of the testing in early February 2013 <br /> and to submit the closure request in early March 2013. <br /> Closin¢ <br /> We appreciate the opportunity to submit this Work Plan. Please contact me if you have any <br /> questions or would like further information. <br /> Since/rely, <br /> C <br /> Scott Forbess <br /> Senior Engineer <br /> Attachments: Figure 1 —Site Map <br /> Figure 2—Phase II IRA Soil-Gas Analytical Results,May 2010 and May 2012 <br /> Figure 3 —Phase II IRA Soil-Vapor Extraction System General Layout <br /> Copies to: Ken Baker, Chartis <br /> Dave Sadoff, Chartis <br /> Phil Johnson, Sims Grupe Management <br /> Joe Salazar, Lewis Brisbois Brisgaard& Smith LLP <br /> 20121000-SVE Optimization and Confirmation Testing <br /> engineers I scientists I innovators <br />
The URL can be used to link to this page
Your browser does not support the video tag.