My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS_2008-2014
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
P
>
PACIFIC
>
0
>
2900 - Site Mitigation Program
>
PR0506203
>
WORK PLANS_2008-2014
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/31/2020 2:59:40 PM
Creation date
3/31/2020 2:47:46 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
FileName_PostFix
2008-2014
RECORD_ID
PR0506203
PE
2960
FACILITY_ID
FA0007271
FACILITY_NAME
LINCOLN CNTR ENV REMEDIATION TRUST
STREET_NUMBER
0
STREET_NAME
PACIFIC
STREET_TYPE
AVE
City
STOCKTON
Zip
95207
CURRENT_STATUS
01
SITE_LOCATION
PACIFIC AVE
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
109
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Geosyntec° <br /> consultants <br /> 5. SCHEDULE <br /> The scope of work proposed herein will commence upon approval of this Work Plan by <br /> the CVRWQCB and obtaining private property access. The scope of work can be <br /> completed within the following timeframe: <br /> • Boring and wells permits from SJEHD and encroachment permits from the City <br /> of Stockton can be obtained within two to three weeks of approval; <br /> • Private property access agreements may take up to 4 weeks to obtain; <br /> • Drilling and sampling activities are expected to begin within one week of <br /> securing the necessary permits and access agreements; <br /> • The drilling and well installation activities are expected to be completed within <br /> six to eight weeks; <br /> • Within six weeks of the completion of field activities and receipt of all <br /> laboratory analytical reports a data transmittal will be submitted to the <br /> CVRWQCB. The data transmittal will include figures, boring logs, tables <br /> summarizing the analytical results, and a brief description of the field activities; <br /> and <br /> • A more thorough description and evaluation of the findings from this <br /> investigation will be provided in the Feasibility Study that will be submitted to <br /> the CVRWQCB in early 2013. <br /> It is recognized that the results of any of the above activities may dictate the necessity <br /> of subsequent activities or a change in the schedule of anticipated activities. <br /> Pre-Design Investigation Work Plan 24 18.05.12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.