Laserfiche WebLink
Geosyntec° <br /> consultants <br /> 5. SCHEDULE <br /> The scope of work proposed herein will commence upon approval of this Work Plan by <br /> the CVRWQCB and obtaining private property access. The scope of work can be <br /> completed within the following timeframe: <br /> • Boring and wells permits from SJEHD and encroachment permits from the City <br /> of Stockton can be obtained within two to three weeks of approval; <br /> • Private property access agreements may take up to 4 weeks to obtain; <br /> • Drilling and sampling activities are expected to begin within one week of <br /> securing the necessary permits and access agreements; <br /> • The drilling and well installation activities are expected to be completed within <br /> six to eight weeks; <br /> • Within six weeks of the completion of field activities and receipt of all <br /> laboratory analytical reports a data transmittal will be submitted to the <br /> CVRWQCB. The data transmittal will include figures, boring logs, tables <br /> summarizing the analytical results, and a brief description of the field activities; <br /> and <br /> • A more thorough description and evaluation of the findings from this <br /> investigation will be provided in the Feasibility Study that will be submitted to <br /> the CVRWQCB in early 2013. <br /> It is recognized that the results of any of the above activities may dictate the necessity <br /> of subsequent activities or a change in the schedule of anticipated activities. <br /> Pre-Design Investigation Work Plan 24 18.05.12 <br />