Laserfiche WebLink
04/23/2001 11:08 2094671118 AGE STOCKTON PAGE 03 <br /> 12/20/2000 12:27 562-`y 7510 THRIFTY OIL CL PAGE 03 <br /> Conditions for N-4442-1-0 (continued) Page 2 of 2 <br /> 7, When VOC emissions are controlled by the catalytic oxidizer, the operating temperature for the combustion chamber <br /> shall be maintained at or above 600 degrees F. [District NSR Rule] <br /> 8. operation of the soil remediation system shall not exceed five years without prior District approval. [District Rule <br /> 4102.] <br /> 9. The total VOC emission rate from the soil remediation system served by the thermal/catalytic oxidizer shall not <br /> exceed 20.4 pounds in any one day. [District NSR Rule] <br /> 10, When VOC emissions are controlled by the thermal oxidizer, the operating temperature for the combustion chamber <br /> shall be maintained at or above 1,400 degrees F. [District NSR Rule] <br /> 11. All records shall be retained for a minimum of 2 years, and shall be made available for Astrid itspection upon <br /> request. [District Rule 10701 <br /> 12. Records of the cumulative running time and the measured influent and effluent VOC concentrations Shall be <br /> tnaitltained. [District Rule 10'10] <br /> 13. sampling to demonstrate mgoing compliance shall be performed at least once per month. [District Rule 108 1] <br /> 14, Ongoing compliance with VOC emission rate and control efficiency requirements shall be demonstrated by sampling <br /> both the influent and the effluent gas streams with an FID, PID, or other District-approved VOC detection device. <br /> [District Rule 10811 <br /> 15. Initial compliance with VOC emission rate and control efficiency shall be demonstrated for each mode of operation <br /> by the results of the laboratory analysis. The results shall be submitted to the Distxiot within 60 dsys of the test. <br /> [District Rule 10811 <br /> 6. Measurements to determine the influent and the effluent gas flow rates shall be taken at the initial inspection. Flow <br /> rate calculations shall be submitted to the District with the laboratory sample analysis results. [District Rule 10811 <br /> 17. Laboratory samples shall be analyzed for TPH and BTEX. [District Rule 10811 <br /> 18. Sampling ports adequate for extraction of grab samples, measurement of gas flow rate, and use of an FID, PID or <br /> other District-approved VOC detection device shall be provided for both the influent and effluent gas streams. <br /> [District Rale 108 11 <br /> 19. Laboratory samples shall be taken at the initial inspection, under the supervision of the APCD Inspector. Samples <br /> shall be taken from both the influent and the effluent gas stream sampling ports. [District Ririe 10811 <br /> 20. Either the VOC control efficiency shall not be less than 95%, or the total VOC emissions rate shall not exceed 2 <br /> pounds in any one day. [District NSR Rule] <br /> 21. Tkze soil remediation system shill be maintained in proper operafing condition at all tides. [District NSR Rine] <br /> 22. No air contaminant shall be released into the atmosphere which causes a public nuisance. (District Rule 41021 <br /> 23, No air contaminant shall be discharged into the atmosphere for a period or periods aggregating more than three <br /> minutes in any one hour which is as dark as, or darker than, Ringelmann 1 or 20% opacity. [District Rule 41011 <br /> 1—M 1-0 Nn.26 WW 1M1-CAWA6. <br />