My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE_FILE 1
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
P
>
PACIFIC
>
7647
>
2900 - Site Mitigation Program
>
PR0505534
>
SITE INFORMATION AND CORRESPONDENCE_FILE 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/31/2020 4:27:15 PM
Creation date
3/31/2020 4:07:39 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
FileName_PostFix
FILE 1
RECORD_ID
PR0505534
PE
2950
FACILITY_ID
FA0006840
FACILITY_NAME
TOSCO SUPER T MARKET
STREET_NUMBER
7647
STREET_NAME
PACIFIC
STREET_TYPE
AVE
City
STOCKTON
Zip
95207
APN
07748014
CURRENT_STATUS
02
SITE_LOCATION
7647 PACIFIC AVE
P_LOCATION
01
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
249
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Best California Gas, Ltd. -2- November 6, 1998 <br /> 2. enable the regulatory agency to review and approve the proposed cost-effective corrective action <br /> alternative before any corrective action work was performed: and <br /> 3. ensure the Fund will only reimburse the most cost-effective corrective action alternative required by <br /> the regulatory agency to achieve the minimum cleanup necessary to protect human health, safety and <br /> the environment. <br /> In some limited situations interim cleanup will be necessary to mitigate a demonstrated immediate <br /> hazard to public health, or the environment. Program regulations allow the responsible party to undertake <br /> interim remedial action after: (1) notifying the regulatory agency of the proposed action, and; (2) <br /> complying with any requirements that the regulatory agency may set. Interim remedial action should <br /> only be proposed when necessary to mitigate an immediate demonstrated hazard. Implementing interim <br /> remedial action does not eliminate the requirement for a CAP and an evaluation of the most cost- <br /> effective corrective action alternative. <br /> Three bids and Cost Preapproval: Only corrective action costs required by the regulatory agency to <br /> protect human health, safety and the environment can be claimed for reimbursement. You must comply <br /> with all regulatory agency time schedules and requirements and you must obtain three bids for any <br /> required corrective action. Unless waived in writing, you are required to obtain preapproval of costs for <br /> all future corrective action work. If you do not obtain three bids and cost preapproval, reimbursement <br /> is not assured and costs may be rejected as ineligible. <br /> If you have any questions, please contact me at(916)227-4411. <br /> Sincerely. <br /> Sandy Gill <br /> Claim Review Unit <br /> Underground Storage Tank Cleanup Fund <br /> cc: Mr. Gordon Boggs Ms. Margaret Lagorio <br /> RWQCB, Reg. 5 - Sacramento San Joaquin County EHD <br /> 3443 Routier Road P.O. Box 2009 <br /> Sacramento, CA 95827-3098 Stockton, CA 95201 <br /> Calijornia Environmental Protection Agency <br /> Recycled Paper <br />
The URL can be used to link to this page
Your browser does not support the video tag.