Laserfiche WebLink
Page 3 of 3 <br /> you have warned me about. As soon as we can enter the site, we will perform a detailed <br /> engineering evaluation and let you know the results. <br /> ? We will take a look at a reduction to semiannual monitoring and sampling during March and <br /> September, or whatever months the data indicates with regard to depth to water and <br /> concentrations, with status reporting on the off quarters. We also have reviewed your letter <br /> dated March 27, 2009 and will implement the sampling reductions and no-purge evaluation. <br /> I will discuss preparation of a SCM with Shelby. I agree that this would be a great place to <br /> start. I would appreciate you sending me your SCM guidelines that we talked about. <br /> One thing I forgot to ask, what are your reporting deadlines for quarterly reports? <br /> Thanks and I will keep you posted. <br /> Diane Barclay, PG, CEG, CHG <br /> Principal Geologist <br /> Stantec <br /> 3017 Kilgore Road Suite 100 <br /> Rancho Cordova CA 95670 <br /> Ph: (916)384-0744 <br /> Fx: (916)861-0430 <br /> Cell: (916)812-3608 <br /> diane.barclay@stantec_com <br /> stantec.com <br /> The content of this email is the confidential property of Stantec and should not be copied, modified, <br /> retransmitted, or used for any purpose except with Stantec's written authorization. If you are not the intended <br /> recipient, please delete all copies and notify us immediately. <br /> ,4j' Please consider the environment before printing this email. <br /> 7/7/2009 <br />