My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE_FILE 3
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
P
>
PACIFIC
>
7647
>
2900 - Site Mitigation Program
>
PR0505534
>
SITE INFORMATION AND CORRESPONDENCE_FILE 3
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/31/2020 4:27:29 PM
Creation date
3/31/2020 4:12:57 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
FileName_PostFix
FILE 3
RECORD_ID
PR0505534
PE
2950
FACILITY_ID
FA0006840
FACILITY_NAME
TOSCO SUPER T MARKET
STREET_NUMBER
7647
STREET_NAME
PACIFIC
STREET_TYPE
AVE
City
STOCKTON
Zip
95207
APN
07748014
CURRENT_STATUS
02
SITE_LOCATION
7647 PACIFIC AVE
P_LOCATION
01
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
265
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BP#172 (THRIFTY) Page 2 of 2 <br /> `w `e <br /> Conditions that do not meet the policy criteria: <br /> • Exposure Type:Commercial <br /> • Bioattenuation Zone Thickness:30ft BioZone Compromised TPH>100mg/kg <br /> • 02 Data in Bioattenuation Zone:No 02 Data <br /> • Benzene in Groundwater:i 1,000 Ng/I <br /> • Soil Gas Benzene:Unknown <br /> • Soil Gas EthylBenzene:Unknown <br /> • Soil Gas Naphthalene:Unknown <br /> Step to Resolve Impediment 3-Step 1:-DELETE STEP <br /> COMPLETION DATE <br /> Submit a work plan to collect data to evaluate the risk to human health and the environment posed by <br /> soil gas or submit a correct action proposal. PROJECTED DATE ACTUAL DATE <br /> 1/152014 <br /> Step to Resolve Impediment 3-Step 2:-DELETE STEP <br /> COMPLETION DATE <br /> II,pl,,,,,, plan if needed. <br /> PROJECTED DATE ACTUALDA <br /> 3/15/2014 <br /> Step to Resolve Impediment 3-Step 3:-!L!FTE STEP <br /> COMPLETION DATE <br /> Submit a report of findings that includes an evaluation of the data. <br /> PROJECTED DATE ACTUAL DATE <br /> 9/15/2014 �— <br /> Step to Resolve Impediment 3-Step 4:-DELETE STEP - <br /> COMPLETION DATE <br /> Adequately reduce risk and hazard <br /> PROJECTED DATE ACTUAL DATE <br /> 12!30!2015 F - <br /> ADD ADDITIONAL STEP <br /> REQUIREMENTS ALONG PATH TO CLOSURE <br /> PUBLIC WELL <br /> DATE IDENTIFIED RP NOTIFICATION PARTICIPATION DESTRUCTION WASTE DISPOSAL LAND USE SITE CLOSURE <br /> FOR CLOSURE CLOSURE INrnATED BY DATE COMPLETION DATE DATE DATE RESTRICTION DATE DAF <br /> Save in Progress Save as Final <br /> LOGGED IN AS MCCARTNE`/V CONTACT GEOTRACKER HELP <br /> https://geotracker.waterboards.ca.gov/regulators/screens/closure_policy.asp?global_id=TO... 11/4/2013 <br />
The URL can be used to link to this page
Your browser does not support the video tag.