My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE_FILE 3
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
P
>
PACIFIC
>
7647
>
2900 - Site Mitigation Program
>
PR0505534
>
SITE INFORMATION AND CORRESPONDENCE_FILE 3
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/31/2020 4:27:29 PM
Creation date
3/31/2020 4:12:57 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
FileName_PostFix
FILE 3
RECORD_ID
PR0505534
PE
2950
FACILITY_ID
FA0006840
FACILITY_NAME
TOSCO SUPER T MARKET
STREET_NUMBER
7647
STREET_NAME
PACIFIC
STREET_TYPE
AVE
City
STOCKTON
Zip
95207
APN
07748014
CURRENT_STATUS
02
SITE_LOCATION
7647 PACIFIC AVE
P_LOCATION
01
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
265
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 1 of 6 <br /> d. <br /> Mike Infurna [EH] <br /> From: Ben Chevlen [ben.chevlen@atcassociates.com] <br /> Sent: Monday, August 15, 2011 4:11 PM <br /> To: Mike Infurna [EH] b� <br /> Subject: RE: TOC-CP# 5449 <br /> No problem Mike; Shelby is interested in the low-risk closure criteria the County is utilizing. It is too early, <br /> however, to know if this site satisfies those criteria (something the SCM and HHRA will address). If the data <br /> indicates active remediation is warranted, Conoco Phillips does have a track record of spending the money <br /> needed to install systems. <br /> As for the wells being repaired; they are all dedicated monitoring points; I don't foresee any of them being <br /> repurposed into permanent remediation wells. If the wells were to be used for feasibility testing; any piping <br /> connected to the wells would likely be temporary above-grade piping. <br /> On an unrelated note, my apologies that the 11192 Stockton CPT work is taking so long to perform (I recall a <br /> phone call we had where you indicated those CPT borings were an even higher priority for you than the 5449 <br /> well installations. <br /> Ben Chevlen, PG i Senior Project Manager i ATC Associates Inc. I Los Angeles <br /> 805-496-1217 direct i 916-425-4849 mobile <br /> 25 Cupania Circle i Monterey Park, California 91755 <br /> 323-517-9780 tel i 323-517-9781 fax I www__,atcassociatgs.com <br /> ATC is a leader in developing innovative Environmental, Geotechnical/CMT/Special Inspections and Health &Safety solutions. View <br /> our video link to learn more. PLEASE NOTE: This message, including any attachments, may include privileged, confidential <br /> and/or inside information. Any distribution or use of this communication by anyone other than the intended recipient is <br /> strictly prohibited and may be unlawful. If you are not the intended recipient, please notify the sender by replying to this <br /> message and then delete it from your computer. <br /> From: Mike Infurna [EH] [mailto:MInfurna@sjcehd.com] <br /> Sent: Monday, August 15, 2011 3:42 PM <br /> To: Ben Chevlen <br /> Subject: RE: TOC-CP # 5449 <br /> sorry to NOT imply you were the boss here Ben, not my intention. I was wondering if Shelby <br /> has a 'plan' for this site that may be leaning towards NO more work (using these wells for <br /> remediation) or downright slammed into the definitely NO MORE WORK wall (as in go for the <br /> new LOW THREAT CLOSURE POLICY bouncing around)..... <br /> the main reason I asked was to be sure you didn't grout the well heads on Aug 26 only to <br /> jackhammer them out latter if these wells are 'hooked' up to some remediation system.. I'd <br /> rather you install a soft bentonite seal inside the boxes if they are thought to be needed for <br /> hook up in the near future rather than hard grout them now only to be busted up (damage the <br /> casing too?) later on.. <br /> I'm ok with a soft bentonite seal as a temporary plan until it can be shown they will NOT be <br /> needed for hook up. <br /> see? <br /> 9/15/2011 <br />
The URL can be used to link to this page
Your browser does not support the video tag.