Laserfiche WebLink
Page 1 of 5 <br /> Mike Infurna [EH] <br /> From: Mike Infurna [EH] <br /> Sent: Monday, May 09, 2011 4:30 PM <br /> To: 'Ben Chevlen' <br /> Subject: RE: 7647 Pacific Ave., Stockton -well permit application packet <br /> Ben, <br /> my head is still achin from the hardhat all day at a site. <br /> you said in your first sentence, "....finalized by Tuesday"...May 10? or May 17.??? <br /> since you don't need a permit from the EHD to air knife, you can start your air knife 5-17 <br /> anyway. and even if Reid gets you the encroachment permit by May 17, you won't really need <br /> an offsite drilling permit til May 23 anyway, right?. <br /> so I will consider the onsite work that starts Thursday, May 19 close enough to be the same <br /> drill phase as May 23. <br /> as for you "paid too much money to the County..", althought technically right, accountants tend <br /> to see only the bottom line and theorethically, you're SHORT since there's a permit fee for <br /> returning the protected wells to County standards. But I'll allow it to stay as it is now with <br /> these days/dates and the money as long as it stays this way. <br /> IF you change days, add delays, spread out the gap, you'll need to send in the $122. I'm <br /> counting on the drillers not using a full hour on each well each day (May 19 and 20th)...any <br /> time under an hour adds time to the un-paid-for well. <br /> I still CAN'T issue the offsite permit w/o a copy of the COS encroachment permit. I can issue <br /> the onsite and list TWO recovered wells. <br /> we'll just 'fix' the third one with the time/money you have submitted. Besides, any overage will <br /> be billed to the "THIRD PARTY BILLING" you identified on the MFR. The EHD will not lose <br /> money on this. <br /> I'm VERY busy in the field and I'll need multiple days to process the offsite once I get the COS <br /> copy. don't wait til Friday afternoon to get it to me....if you want to drill offsite on Monday May <br /> 23, then I MUST have the COS copy NLT May 18, before closing. I may have to process the <br /> application before 8am on May 18 or after work on May 18, since I'll be onsite at this site all <br /> day May 19.... <br /> mike <br /> From: Ben Chevlen [maiIto:ben.chevlen @atcassociates.com] <br /> Sent: Monday, May 09, 2011 12:20 PM <br /> To: Mike Infurna [EH] <br /> Subject: RE: 7647 Pacific Ave., Stockton - well permit application packet <br /> Mike—I talked to Reid Cambell at City of Stockton. He indicated he MAY be able to get the City <br /> encroachment permit finalized by Tuesday. We are currently scheduled to air knife all locations on 5/17 <br /> and 5/18, and install wells on 5/19 and 5/20. I've scheduled the driller to return to the site on 5/23 for <br /> one day, assuming that the encroachment permit will have been received by next Tuesday, and that the <br /> location would be air knifed on 5/18. <br /> 5/16/2011 <br />