My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE_FILE 3
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
P
>
PACIFIC
>
7647
>
2900 - Site Mitigation Program
>
PR0505534
>
SITE INFORMATION AND CORRESPONDENCE_FILE 3
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/31/2020 4:27:29 PM
Creation date
3/31/2020 4:12:57 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
FileName_PostFix
FILE 3
RECORD_ID
PR0505534
PE
2950
FACILITY_ID
FA0006840
FACILITY_NAME
TOSCO SUPER T MARKET
STREET_NUMBER
7647
STREET_NAME
PACIFIC
STREET_TYPE
AVE
City
STOCKTON
Zip
95207
APN
07748014
CURRENT_STATUS
02
SITE_LOCATION
7647 PACIFIC AVE
P_LOCATION
01
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
265
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 1 of 1 <br /> Mike Infurna [EH] <br /> From: Nuel Henderson [EH] <br /> Sent: Thursday, September 09, 2010 1:47 PM <br /> To: Adrienne Ellsaesser [EH]; Mike Infurna [EH] <br /> Subject: 7647 Pacific Ave <br /> Adrienne and Mike, <br /> Diane of Stantec returned my call and we discussed the changing situation on the site. In view of the moved up <br /> date for the station construction activities to October, Diane doesn't believe GWE should be implemented as the <br /> interim remediation would of necessity be curtailed after a very short run for the construction work to proceed. We <br /> discussed the problems with the present state of the site characterization and the need to reevaluate remedial <br /> technologies to adequately address residual contaminants in submerged soil and groundwater. Diane will submit <br /> a short explanation for aborting the approved IRAP and proposals for proper destruction of monitoring wells to <br /> accommodate the site construction. <br /> Nuel <br /> 9/28/2010 <br />
The URL can be used to link to this page
Your browser does not support the video tag.