My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE_FILE 3
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
P
>
PACIFIC
>
7647
>
2900 - Site Mitigation Program
>
PR0505534
>
SITE INFORMATION AND CORRESPONDENCE_FILE 3
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/31/2020 4:27:29 PM
Creation date
3/31/2020 4:12:57 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
FileName_PostFix
FILE 3
RECORD_ID
PR0505534
PE
2950
FACILITY_ID
FA0006840
FACILITY_NAME
TOSCO SUPER T MARKET
STREET_NUMBER
7647
STREET_NAME
PACIFIC
STREET_TYPE
AVE
City
STOCKTON
Zip
95207
APN
07748014
CURRENT_STATUS
02
SITE_LOCATION
7647 PACIFIC AVE
P_LOCATION
01
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
265
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
-9MAM(TURIFTY) - Page 1 of 2 <br /> Path to Closure Plan GO GEOTRACKER HOME I MANAGE PROJECTS I REPORTS I SEARCHCL.Qj <br /> BP#172(THRIFTY)(TO607700604)-MAP THIS SITE OPEN-REMEDIATION <br /> 7647 PACIFIC AVE CLEANUP OVERSIGHT AGENCIES <br /> STOCKTON,CA 95207 ACTIVITIES REPORT SAN JOAQUIN COUNTY LOP(LEAD)-CASE#.1227 <br /> CASEWORKER:VICKI MCCARTNEY-SUPERVISOR:ADRIENNE ELLSAESSER <br /> SAN JOAQUIN COUNTY PUBLIC WEBPAGE CENTRAL VALLEY RAQCB(REGION 5S)-CASE#.390652 <br /> VIEW PRINTABLE CASE SUMMARY FOR THIS SITE CASEWORKER:JAMES BARYON-SUPERVISOR:COR/CONDON <br /> CLIF CWm s:13547,2156 CUF Priority Assigned:C,D CUF Amount Paid:f1-180.873 <br /> THIS PROJECT WAS LAST MODIFIED BY VICKI MCCAaE=ON 55115/2014 2:54:27 PM-HISTORY <br /> THIS SITE HAS SUBMITTALS.CLICK ll.TO OPEN ANEW WINDOW WITH THE SUBMITTAL APPROVAL PAGE FOR THIS SITE. <br /> Path to Closure Plan THIS VERSION IS FINAL AS OF 511512014 PATH TO CLOSURE HISTORY CLEAR I RESET PATH TO CLOSURE PLAN <br /> IMPEDIMENT 1: <br /> General Criteria F:Secondary source has NOT been removed to the extent practicable F Procedural Impediment-1NF0� <br /> Stop to Resolve Impediment 1-Stop 1:- <br /> COMPLETION DATE <br /> Completion and submittal of a Corrective Action Plan as directed by the San Joaquin County Environmental <br /> 111-111h Department by letter dated 11 October 2013, PROJECTED DATE ACTUAL DATE <br /> 1/15/2014 r 1/14/2014 <br /> Step to Resolve Impediment 1-Step 2:-DELETE STEP <br /> COMPLETION DATE <br /> 30-day public participation period, <br /> PROJECTED DATE ACTUAL DATE <br /> 311520144/17f2014 <br /> Stet to Resolve Impediment 1-Step 3:-DELETE STEP <br /> COMPLETION DATE <br /> Submittal ar.d approval of the m•_di•.,l action plan. <br /> PROJECTED DATE ACTUAL DATE <br /> 9/15/2014 <br /> Stop to Resolve Impediment 1-Step 4:-DELETE STEP <br /> COMPLETION DATE <br /> Implement remedial action <br /> PROJECTED DATE ACTUAL DATE <br /> 3/30/2015 1 <br /> Step to Resolve Impediment 1-Step 5:-DELETE STEP <br /> - COMPLETION DATE <br /> complete remedial a:co:.. <br /> PROJEC31D DA19 ACTUAL DATE <br /> 1213012015 �^ <br /> ADD ADDITIONAL STEP <br /> IMPEDIMENT 2: <br /> Media-Specific Criteria:Groundwater:The contaminant plume that exceeds water quality objectives is ❑ Procedural Impediment-gn <br /> NOT stable or decreasing in areal extent,and does NOT meet all of the additional characteristics of one of <br /> the five classes of sites. <br /> Conditions that do not meet the policy criteria: <br /> • Plume Length(That Exceeds Water Quality Objectives):i 250 Feet and<1,000 Feet <br /> • Free Product in Groundwater:No <br /> • Benzene Concentration:>3,000 Ng/I <br /> • Nearest Supply Well(From Plume Boundary):<_250 Feet <br /> • Nearest Surface Water Body(From Plume Boundary):5 250 Feet <br /> Step to Resolve Impediment 2-Step 1:- _—� <br /> Implement remedial action. COMPLETION DATE <br /> PROJECTED DATE ACTUAL DATE <br /> 3/30/2015 �— <br /> Step to Resolve Impediment 2-Step 2:-DELETE STEP <br /> COMPLETION DATE <br /> Complete remedail action. <br /> PROJECTED DATE ACTUAL DATE <br /> 1213012015 1 <br /> Step to Resolve Impediment 2-Step 3:-DELETE STEP <br /> COMPLETION DATE <br /> Submit a -k plan to delineate the qr ndwater plume down-gradient of monitoring well MW-22. <br /> PROJECTED DAIS ACTUAL DATE <br /> 9/152014 <br /> Step to Resolve Ynpedlment 2-Step 4:- ---- <br /> COMPLETION DATE <br /> Implement the work plan to delineate the groundwater plume and submit a report of findings. <br /> PROJECTED DATE � <br /> 12/3/2014 I J <br /> ADD ADDITIONAL STEP <br /> IMPEDIMENT 3: <br /> Media Specific Criteria:Petroleum Vapor Intrusion to Indoor Air:The site is NOT considered low-threat for C- Procedural Impediment-nn <br /> the vapor-intrusion-to-air pathway and site-specific conditions do NOT satisfy items 2a,2b,or 2c. <br /> Conditions that do not meet the policy criteria: <br /> https://geotracker.waterboards.ca.gov/regulators/screens/closure_policy.asp?global_id=TO... 5/15/2014 <br />
The URL can be used to link to this page
Your browser does not support the video tag.