My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0009630
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
P
>
PACIFIC
>
7647
>
2900 - Site Mitigation Program
>
PR0505534
>
ARCHIVED REPORTS_XR0009630
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/31/2020 5:14:25 PM
Creation date
3/31/2020 4:32:46 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0009630
RECORD_ID
PR0505534
PE
2950
FACILITY_ID
FA0006840
FACILITY_NAME
TOSCO SUPER T MARKET
STREET_NUMBER
7647
STREET_NAME
PACIFIC
STREET_TYPE
AVE
City
STOCKTON
Zip
95207
APN
07748014
CURRENT_STATUS
02
SITE_LOCATION
7647 PACIFIC AVE
P_LOCATION
01
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
125
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
, a <br /> Thrifty Oil Co. Station #172 <br /> Page3 <br /> Groundwater Treatment System <br /> The groundwater treatment system was started in conjunction with the vapor treatment system on <br /> April 26, 2001, and the flow meter started at zero Presently, the remediation system is connected <br /> to groundwater wells MW-10 and MW-11 Two down-well pneumatic pumps (one in each well), <br /> draw water into a 150 gallon polyvinyl tank which then transfers the water through two (2) one <br /> thousand pound canisters with activated carbon <br /> During this reporting period, the groundwater extraction system treated and discharged <br /> approximately 18,315 gallons as of December 27, 2001, for a total of 77,071 gallons The <br /> groundwater remediation system influent, intermediate, and effluent streams were sampled on <br /> October 18,November 14, and December 19, 2001 for TPH-g by EPA method 8015, BTEX/MTBE <br /> by EPA method 8021B EPA method 8260B was used to confirm MTBE concentrations for the <br /> samples collected on November 14 and December 19, 2001 Groundwater samples were collected <br /> from the inlet ports of the system from wells MW-10 and MW-11 on November 28, 2001 Field <br /> status reports are presented in Appendix C, and laboratory analytical results for the groundwater <br /> samples are included in Appendix E Historical groundwater system operations are reported in <br /> Table 4 <br /> • Summary and Recommendations <br /> The soil vapor extraction was started on April 12, 2001, and groundwater extraction was started on <br /> April 26, 2001 A total of 28,340 pounds of hydrocarbons have been destroyed by the vapor <br /> extraction system, and 77,071 gallons of groundwater has been treated by the groundwater system <br /> Thrifty will continue quarterly groundwater monitoring, gauging, purging and sampling of all <br /> groundwater monitoring wells, and operation of the remediation system <br /> All interpretations expressed in this report are based solely upon review of data collected by EMC, <br /> and analysis by Associate Laboratories <br /> Written by Reviewed by <br /> r <br /> 0 , <br /> R <br /> L/L <br /> and C Friedrichsen, REA II Ross A Williams <br /> Project Manager, MBA Registered Geologist#63 �cF=p,�� cFCZ <br /> 0 <br /> Senior Environmental Hydrogeologist v <br /> • � ROSS A � <br /> * WILLIAMS <br /> N No 5327 `Q <br /> 9�CF <br />
The URL can be used to link to this page
Your browser does not support the video tag.