My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
N
>
99 (STATE ROUTE 99)
>
22700
>
2900 - Site Mitigation Program
>
PR0506618
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 1:57:04 PM
Creation date
4/1/2020 1:38:14 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0506618
PE
2950
FACILITY_ID
FA0003936
FACILITY_NAME
NELSON READY MIX CONCRETE
STREET_NUMBER
22700
Direction
S
STREET_NAME
STATE ROUTE 99
City
RIPON
Zip
95366
CURRENT_STATUS
01
SITE_LOCATION
22700 S HWY 99
P_LOCATION
05
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
110
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i <br /> CHRONOLOGY <br /> 22700 HIGHWAY 99, RIPON <br /> 01/12/88 A soil sample was collected beneath a 500 gallon gasoline <br /> underground storage tank (UST) that was previously closed in <br /> place at the site. The analytical results of that soil sample were <br /> non-detect for contaminants and no further action was required of <br /> that UST. <br /> 04/14/95 A 4000 gallon diesel UST was removed from the site and 2 soil <br /> samples were collected, the results showed diesel contamination. <br /> 02/10/97 The site was placed in the Local Oversight Program. <br /> 04/29/97 A work plan for 4 soil borings to further investigate the <br /> contamination. <br /> 05/09/97 Soil borings B1,132, B3, B4 were completed. Grab groundwater <br /> and soil samples were collected. High levels of diesel <br /> contamination were found in the samples from 131 and B2, which <br /> were at the ends of the former diesel UST location. B3 was near <br /> the closed in place gas UST and the analytical results for gasoline <br /> were non detect_ <br /> 05/29/97 Preliminary Site Investigation Report Route 99/Jack Tone Road <br /> Interchange Reconstruction Project includes information from <br /> 519197 work. <br /> 04/21/98 A work plan for 6 soil borings, 3 of which are to be completed as <br /> monitoring wells. <br /> 5128-29198 Monitoring wells MW1, MW2, MW3 installed and soil borings SB5, <br /> SB6, SB7 (20' deep) completed. MW 1 and MW3 screen interval <br /> 10 to 25 feet. MW2 screen interval 8 to 23 feet. Soil from S137, <br /> drilled in former diesel UST area, had diesel at 15 and 20 feet. <br /> Groundwater flow direction is towards Highway 99. MW1 <br /> evidenced diesel contamination. MW2 and MW3 were non detect <br /> for contaminants. <br /> 07/17/98 Environmental Site Investigation Report on May 1998 work. <br /> 09/28/98 A work plan for 5 geoprobes to define the lateral and vertical extent <br /> of contamination and to propose excavation of soil from the former <br /> diesel UST location. <br />
The URL can be used to link to this page
Your browser does not support the video tag.