My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
N
>
99 (STATE ROUTE 99)
>
22700
>
2900 - Site Mitigation Program
>
PR0506618
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 1:57:04 PM
Creation date
4/1/2020 1:38:14 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0506618
PE
2950
FACILITY_ID
FA0003936
FACILITY_NAME
NELSON READY MIX CONCRETE
STREET_NUMBER
22700
Direction
S
STREET_NAME
STATE ROUTE 99
City
RIPON
Zip
95366
CURRENT_STATUS
01
SITE_LOCATION
22700 S HWY 99
P_LOCATION
05
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
110
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
�i <br /> 4 �'�` <br /> J <br /> FEB 115 W9 <br /> Nelson Ready Mix Concrete& Rock Co.,Inc. -2- <br /> I. <br /> 2-I. help the responsible party undertake the necessary corrective action in a cost-effective, efficient and <br /> timely manner; <br /> 2. enable the regulatory agency to review and approve the proposed cost-effective corrective action <br /> alternative before any corrective action work was performed; and <br /> 3. ensure the Fund will only reimburse the most cost-effective corrective action alternative required by <br /> the regulatory agency to achieve the minimum cleanup necessary to protect human health, safety and <br /> the environment. <br /> In some limited situations interim cleanup will be necessary to mitigate a demonstrated immediate <br /> hazard to public health, or the environment. Program regulations allow the responsible party to <br /> undertake interim remedial action after: (I)notifying the regulatory agency of the proposed action, and.- <br /> (2) <br /> nd;(2)complying with.any requirements.that the regulatory agency-may set. Interim remedial action should' <br /> only be proposed when necessary to mitigate an immediate demonstrated hazard.Implementing interim <br /> remedial action does not eliminate the requirement for a CAP and an evaluation of the most cost- <br /> effective corrective action alternative. <br /> Three bids and Cost Preapproval: Only corrective action costs required by the regulatory agency to <br /> protect human health, safety and the environment can be claimed for reimbursement. You must comply <br /> with all regulatory agency time schedules and requirements and you must obtain three bids for any <br /> required corrective action. Unless waived in writing,you are required to obtain preapproval of costs for <br /> all future corrective action work. If you do not obtain three bids and costPreapproval, reimbursement <br /> is not assured and costs may be rejected as ineligible. <br /> If you have any questions, please contact Sandy Gill at(916) 227-4411. <br /> Sincerely, <br /> Dave Deaner, Manager <br /> Underground Storage Tank Cleanup fund <br /> cc: Mr. Gordon Boggs Ms. Margaret Lagorio <br /> RWQCB,Reg. 5 - Sacramento San Joaquin County EHD <br /> 3443 Routier Road P.O. Box 2009 <br /> Sacramento, CA 95827-3098 Stockton, CA 95201 <br /> California Environmental Protection Agency <br /> �a Recycled Paper <br />
The URL can be used to link to this page
Your browser does not support the video tag.