Laserfiche WebLink
- _ URS Greiner,Inc. <br /> 100 California Street, Suite 500 <br /> San Francisco, California 94111-4529 <br /> V r Telephone:(415)774-2700 <br /> URSGreiner Facsimile:(415)398-1904 <br /> Offices in Principal Cities Nationwide <br /> April 29; 1997 1 <br /> PAYMENT � <br /> RECEIVED <br /> 1 <br /> Mr. Ron Rowe A€. P, L tnG� i <br /> San Joaquin County Public Health SAN J:if;Qr;,:.. <br /> Environmental Health Division PUBLIC ►-3FAL14-J, I,'-- "y;r-s <br /> 344 East Weber Avenue, 3rd Floor ENVlRO�dir:Et�Jr.��;' �r; ;;;0,JS10N <br /> Stockton, CA 95202 <br /> Dear Mr. Rowe: <br /> I have enclosed with this letter the drilling permit application for the <br /> Preliminary Site Investigation at the SR99/Jack Tone Road project. The <br /> application includes a sampling plan that incorporates all of the elements we <br /> recently discussed. Please review the plan and fax your comments to me at <br /> (415) 398-1904 at your earliest convenience. I filled out the permit application <br /> forms to the best of my ability. Let me make it clear that we have no <br /> relationship with Russell Nelson or Nelson Ready-Mix. We have been <br /> subcontracted by Rajappan and Meyer, the prime contractor to the City of <br /> Ripon and Caltrans for the SR99/Jack Tone Road project. We in turn will { <br /> subcontract Gregg Drilling and Testing to complete the subsurface sampling. <br /> URS Greiner, Inc. (URSG) is expecting to make two site visits: one, on May 6, <br /> to arrange for utilities clearance at the Nelson Ready Mix site and to collect <br /> the surface samples, and the other, on May 9, to complete the Nelson Ready- <br /> Mix subsurface investigation. Please call me at (415) 774-2778 with any <br /> questions or concerns, and thank for you assistance in the successful <br /> completion of this project. <br /> Sincerely, <br /> A_J_ <br /> Avram J. Frankel <br /> Environmental Engineer/ <br /> Project Manager <br /> cc: Ninh Le, Rajappan and Meyer <br /> enclosure <br />