My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
N
>
99 (STATE ROUTE 99)
>
22700
>
2900 - Site Mitigation Program
>
PR0506618
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 1:59:16 PM
Creation date
4/1/2020 1:41:07 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0506618
PE
2950
FACILITY_ID
FA0003936
FACILITY_NAME
NELSON READY MIX CONCRETE
STREET_NUMBER
22700
Direction
S
STREET_NAME
STATE ROUTE 99
City
RIPON
Zip
95366
CURRENT_STATUS
01
SITE_LOCATION
22700 S HWY 99
P_LOCATION
05
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
84
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
`NOW w/ <br /> 2.5 Sample Analysis <br /> URSG will submit the soil and groundwater samples to Superior Laboratory <br /> of San Francisco, California, a state-certified laboratory, for the standard <br /> turnaround analyses detailed in the table below. <br /> Sample Cate o I Analytical Method Parameter <br /> Borehole: Diesel UST EPA 8015M/8020 TPH Diesel/BTEX <br /> Borehole: Gas UST EPA 8015M/8020/ TPH Gas/TPH Diesel/BTEX/ <br /> 8240 MTBE/ Volatiles Scan <br /> Borehole: Septic System EPA 8240 Volatiles Scan <br /> Agricultural Survey EPA 8080 Pesticides <br /> Railroad EPA 8270 Creosote <br /> Interchange EPA 6010 Total Lead <br /> Superior will submit the analytical results to URSG within 1 week, including <br /> a standard internal laboratory QA/QC package. <br /> 3.0 Deliverables <br /> A summary report will be submitted to Caltrans District 10 and the City of <br /> Ripon. This report will include: <br /> • photodocumentation of the sampling events; <br /> • revised sampling location maps; <br /> • laboratory analytical data reports; <br /> • Chain-of-Custody documentation; <br /> • a detailed narrative of sample collection; <br /> • any deviations from the sampling plan, with justification; <br /> • comparisons of sample results to applicable regulatory standards; <br /> • delineation of areas in exceedance of applicable regulatory standards; and <br /> • recommendations for further work, as required. <br /> A final report will be submitted to the owner/representative(s) within 2 <br /> weeks of receipt of comments on the draft report. <br /> PSI Soil Sampling Plan Page 5 <br /> SR99/Jack Tone Road Interchange Project <br />
The URL can be used to link to this page
Your browser does not support the video tag.