My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FIELD DOCUMENTS_CASE 2
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
N
>
99 (STATE ROUTE 99)
>
25355
>
2900 - Site Mitigation Program
>
PR0508370
>
FIELD DOCUMENTS_CASE 2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 1:51:29 PM
Creation date
4/1/2020 1:45:14 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
FIELD DOCUMENTS
FileName_PostFix
CASE 2
RECORD_ID
PR0508370
PE
2950
FACILITY_ID
FA0008045
FACILITY_NAME
PACIFIC AUTO CENTER
STREET_NUMBER
25355
Direction
N
STREET_NAME
STATE ROUTE 99
City
ACAMPO
Zip
95220
CURRENT_STATUS
01
SITE_LOCATION
25355 N HWY 99
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
148
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
S CIAL ' .'RO IS O:N <br /> Winter Weather Utility Work <br /> 1. SUPERVISION: The utility.company (permittee) shall furnish full-time supervision <br /> of all work to insure full compliance with the permit provisions. <br /> 2. START OF WORK No work within the County right-of-way shall be started until the <br /> utility company representative has made an evaluation of weather conditions and <br /> has determined the work can be accomplished under the provisions of the permit. <br /> 3. CLEAN PAVE_MENJn . Dirt and mud shall not be deposited on the pavement <br /> outside the area of work, and if inadvertently tracked onto the road travel way shall } <br /> be removed immediately. X <br /> 4. pAILY ON: Private driveways and road intersections shall be restored <br /> daily. <br /> 5. WEATHER-TIGHT CORDITION• All trenches shall be filled and compacted, <br /> ditches and other drainage facilities regraded and opened, and the entire work area l <br /> restored to weather-tight condition prior to any rain. <br /> �L <br /> I' <br /> ,I <br /> M <br /> _ 1 <br /> P <br /> 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.