Laserfiche WebLink
SYF l 121E PRO — <br /> V 1S10IN' S <br /> Winter Weather Utility Work <br /> 1. SUPERVISION: The utility company (permittee) shall furnish full-time supervision <br /> of all work to insure full compliance with the permit provisions. <br /> 2. START OF WORK: No work within the County right-of-way shall be started until the <br /> utility company representative has made an evaluation of weather conditions and has <br /> determined the work can be accomplished under the provisions of the permit. <br /> I <br /> 3. CLEAN PAVEMENT: Oirt and mud shall not be deposited on the pavement <br /> outside the area of work, and if inadvertently tracked onto the road travel way shall <br /> i be removed immediately. <br /> { 4. DAILY RESTORATION: Private driveways and road intersections shall be restored <br /> 1 <br /> daily <br /> i <br /> 5. WEATHER-TIGHT CONDITION: All trenches shall be filled and compacted, <br /> ditches an other drainage facilities regraded and opened, and the entire work area <br /> i restored to weather-tight condition prior to any rain. <br /> i <br /> i <br /> i <br /> { <br /> i <br /> i <br /> 7 <br />