My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE_CASE 2
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
N
>
99 (STATE ROUTE 99)
>
25355
>
2900 - Site Mitigation Program
>
PR0508370
>
SITE INFORMATION AND CORRESPONDENCE_CASE 2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 1:51:34 PM
Creation date
4/1/2020 1:47:14 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
FileName_PostFix
CASE 2
RECORD_ID
PR0508370
PE
2950
FACILITY_ID
FA0008045
FACILITY_NAME
PACIFIC AUTO CENTER
STREET_NUMBER
25355
Direction
N
STREET_NAME
STATE ROUTE 99
City
ACAMPO
Zip
95220
CURRENT_STATUS
01
SITE_LOCATION
25355 N HWY 99
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
356
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r <br /> San Joaquin County DIRECTOR <br /> Po u�N Donna Heran, REHS <br /> Environmental Health Department ASSISTANT DIRECTOR <br /> 600 East Main Street Laurie Cotulla,REHS <br /> Stockton, California 95202-3029 PROGRAM COORDINATORS <br /> Carl Bergman, REHS <br /> C4 <br /> Website: www.S OV.or /ehd Mike Huggins,REHS,RDI� FpRi�`P �g g Margaret Lagorio, REHS <br /> Phone: (209)468-3420 Robert McClellon, REHS <br /> Fax: (209)464-0138 Jeff Carruesco,REHS,RDI <br /> SEP 2 5 2007 Kasey Foley, REHS <br /> JENNIFER SEDLACHEK CONTACT: KEVIN MEEKS <br /> EXXONMOBIL OIL CORPORATION PAT & KATHLEEN MEEKS <br /> 4096 PIEDMONT AVE #194 25355 HWY 99 <br /> OAKLAND CA 94611 ACAMPO CA 95220 <br /> RE: Meeks RV (former Pacific Auto Center) SITE CODE: 508378 <br /> 25355 North Highway 99 <br /> Acampo, California 95220 <br /> San Joaquin County Environmental Health Department (EHD) has reviewed Addendum <br /> to Work Plan for Additional Soil and Groundwater Investigation, dated September 6, <br /> 2007, prepared and submitted by Environmental Resolutions, Inc. (ERI) on your behalf <br /> for the above-referenced site. In the work plan, ERI proposes the installation of one two- <br /> inch diameter groundwater monitoring well (MW7) screened between approximately 128 <br /> and 138 feet below ground surface (bgs) located onsite between the domestic well and the <br /> former cone penetration testing (CPT) boring CPT1. EHD has recommended such a <br /> monitoring well be installed to target the permeable unit identified from the pore pressure <br /> and lithologic log for CPTI. <br /> EHD approves the work plan as submitted for the installation of MW7 to monitor <br /> chemicals of concern detected in grab groundwater samples collected from CPT1 at <br /> depths between 135 and 138 feet bgs. The boring will be advanced using sonic drilling <br /> equipment and soil samples will be collected at a minimum of five-foot intervals from <br /> surface grade to approximately 50 feet bgs and from approximately 120 feet bgs to total <br /> depth of approximately 138 feet bgs, while continuously collecting soil samples from five <br /> feet above the proposed screen interval to total depth for proper well screen placement. <br /> Selected soil samples collected during the well installation and groundwater samples <br /> collected during the quarterly groundwater sampling events will be analyzed for total <br /> petroleum hydrocarbons quantified as gasoline (TPHg); benzene, toluene, ethylbenzene, <br /> and total xylenes (BTEX); 1,2-dichloroethane (1,2-DCA), 1,2-dibromoethane (EDB), <br /> methyl tertiary-butyl ether (MTBE), ethyl tertiary-butyl ether (ETBE), tertiary-amyl <br /> methyl ether(TAME), di-isopropyl ether(DIPE), and tertiary butyl alcohol (TBA). <br /> EHD has issued permits 0052027, 0052032, and 0052033 for the installation of <br /> monitoring wells MW6 and MW7, and advancement of cone penetration testing (CPT) <br /> borings CPT2, CPT3, and CPT4. ERI has notified EHD that fieldwork is scheduled for <br /> October 8 through 17,2007. <br />
The URL can be used to link to this page
Your browser does not support the video tag.