My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE_CASE 2
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
N
>
99 (STATE ROUTE 99)
>
25355
>
2900 - Site Mitigation Program
>
PR0508370
>
SITE INFORMATION AND CORRESPONDENCE_CASE 2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 1:51:34 PM
Creation date
4/1/2020 1:47:14 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
FileName_PostFix
CASE 2
RECORD_ID
PR0508370
PE
2950
FACILITY_ID
FA0008045
FACILITY_NAME
PACIFIC AUTO CENTER
STREET_NUMBER
25355
Direction
N
STREET_NAME
STATE ROUTE 99
City
ACAMPO
Zip
95220
CURRENT_STATUS
01
SITE_LOCATION
25355 N HWY 99
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
356
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ENVIRONMENTAL HEALTH EPARTMENT <br /> UIN COUNTY <br /> + <br /> o. ' —'�•o SAN':�OA Unit Supervisors <br /> Donna R.Heran,R.E.H.S. Carl Borgman,R.E.H.S. <br /> Q:� f- > �• .a 304 East Weber Avenue, Third Floor <br /> Director Mike Huggins,R.E.H.S.,R.D.I. <br /> S Al Olsen,R.E.H.S. Stockton, California 95202-2708 Douglas W.Wilson,R.E.H.S. <br /> Program ManagerTelephone:;(209) 468-3420 Margaret Lagorio,R.E.H.S. I <br /> Ci�oR Laurie A.Cotulla,R.E.H.S. Fax: (209) 464_0138 Robert McClellon,R.E.H.S.. <br /> Program Manager — Mark Barcellos,R.E.H.S. <br /> i <br /> CONTACT: KEVIN MEEKS <br /> PAT & KATHLEEN MEEKS <br /> 25355 HWY 99 <br /> ACAMPO CA 95220 <br /> RE: PACIFIC AUTO CENTER SITE CODE: 508378 <br /> 25355 HWY 99 <br /> ACAMPO CA 95220 <br /> WORKPLAN: Cone Penetrometer TestinVn, and Monitoring Well Installation Work Plan r <br /> DATED: Tuly 15 2004 PREPARED BY: Advanced GeoEnvironmental Inc�AQF- <br /> APPROVED <br /> ❑ <br /> DISAPPROVED <br /> ❑ ADDENDUM .'Submit by : <br /> ADEQUATE AND NECESSARY ELEMENTS OF THE WORKPLAN (H&S I. <br /> 25296.10(c)(3).): <br /> 1. Installation of one pair of cone penetrometer borings (one for CPT sounding, the l <br /> other for grab groundwater sample collection) to 150 feet bsg. <br /> 2. installation of two additional monitoring wells 1�,ff4 and MW5 to about 90 feet bsg <br /> to define the extent of the contamination plume and to provide''down-gradient <br /> sentinel monitoring points between the site and off site private receptor wells. <br /> 3. Samples will be submitted to laboratory for analyses of TPH-G"BTEY, the five fuel <br /> oxygenates and 1,2-DCA and EDB., <br /> COMMENTS AND CONDITIONS: . <br /> 1. Contingency to install additional monitoring wells, and to modify screen sections and <br /> location of the wells based on geological information and sampling results of the <br /> CPT borings. <br /> 2. Implement the proposed work by September 23, 2004. <br /> REASONS FOR DISAPPROVAL OF THE WORKPLAN (H&S 25296.10(C)(3).): <br /> None if conditions are met. <br /> DATED Au st 12 2004 BY - <br /> �f, <br /> E Cc: CRWQCB, Central Valley Region—James L. L. Barton,RG <br /> Robert Marty <br /> Cc: Advanced GeoEnvironmental, Inc. <br /> :M <br /> t <br />
The URL can be used to link to this page
Your browser does not support the video tag.