My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS_CASE 2
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
N
>
99 (STATE ROUTE 99)
>
25355
>
2900 - Site Mitigation Program
>
PR0508370
>
WORK PLANS_CASE 2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 1:52:24 PM
Creation date
4/1/2020 1:52:14 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
FileName_PostFix
CASE 2
RECORD_ID
PR0508370
PE
2950
FACILITY_ID
FA0008045
FACILITY_NAME
PACIFIC AUTO CENTER
STREET_NUMBER
25355
Direction
N
STREET_NAME
STATE ROUTE 99
City
ACAMPO
Zip
95220
CURRENT_STATUS
01
SITE_LOCATION
25355 N HWY 99
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
60
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
%W01 NOW <br /> 15 July 2004 <br /> AGE-NC Project No. 98-0540 <br /> Page 9 of 10 <br /> 4.5.2. Well Evacuation <br /> Subsequent to measurement of depth to water and prior to sampling, the well will be purged using <br /> a submersible pump or a disposable bailer to ensure that the sample is representative of the <br /> formation,rather than water standing in the well casing.The well will be purged until: 1)a minimum <br /> of three casing-water volumes is removed from the well; and/or 2)the field-measured ground water <br /> parameters have stabilized. <br /> However, if a well is purged dry prior to evacuating three casing-water volumes, a ground water <br /> sample will be collected following 80 percent recovery of ground water within the well or within 8 <br /> hours of well evacuation. <br /> 4.5.3. Sample Withdrawal <br /> Water samples will be collected from the monitoring well using a disposable polyethylene bailer. <br /> These bailers are disposed of after one use and require no decontaminating,thereby minimizing cross <br /> contamination due to sampling devices. Samples will be drawn and collected in such a manner that <br /> agitation and exposure of the groundwater to the atmosphere is minimal. Sample containers will be <br /> filled using the appropriate disposable sampling attachment which allows controlled flow out of the <br /> bottom of the bailer by lifting up on the check valve. <br /> 4.5.4. Sample Handling <br /> Ground water samples will be collected into laboratory-supplied containers. Ground water samples <br /> for BTEX,TPH-g, and fuel oxygenates analyses will be collected into 40-m1 VOA vials containing <br /> 0.5 ml of hydrochloric acid as preservative. Samples for TPH-d analysis will be collected into I-liter <br /> amber glass containers without a preservative. Following collection,the samples will be placed on <br /> ice and kept in a cooler until delivered to the laboratory for analysis.Chain-of-custody protocols will <br /> be used to document sample custody transfer from the field to the analytical laboratory.A chain-of- <br /> custody form will accompany the samples. <br /> 4.6. EQUIPMENT DECONTAMINATION <br /> All sampling tools used for sample collection will be thoroughly rinsed with clean water after being <br /> washed with a solution of Alconox.All down-hole drilling and sampling equipment will be pressure <br /> washed prior to starting each boring. <br /> Advanced GeoE nvi ron mental,Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.