My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS_CASE 2
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
N
>
99 (STATE ROUTE 99)
>
25355
>
2900 - Site Mitigation Program
>
PR0508370
>
WORK PLANS_CASE 2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 1:52:24 PM
Creation date
4/1/2020 1:52:14 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
FileName_PostFix
CASE 2
RECORD_ID
PR0508370
PE
2950
FACILITY_ID
FA0008045
FACILITY_NAME
PACIFIC AUTO CENTER
STREET_NUMBER
25355
Direction
N
STREET_NAME
STATE ROUTE 99
City
ACAMPO
Zip
95220
CURRENT_STATUS
01
SITE_LOCATION
25355 N HWY 99
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
60
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Cone Penetrometer Testing and Monitoring Well Installation Work Plan <br /> Former PACIFIC AUTO CENTER FACILITY <br /> 25355 North Highway 99, Acampo, California <br /> TABLE OF CONTENTS <br /> SECTION PAGE <br /> 1.0. INTRODUCTION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1 <br /> 2.0. BACKGROUND . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1 <br /> 2.1. UNDERGROUND STORAGE TANK REMOVAL . . . . . . . . . . . . . . . . . . . . . . 1 <br /> 2.2. PREVIOUS SITE ASSESSMENT . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2 <br /> 2.3. GROUND WATER DEPTH AND FLOW DIRECTION . . . . . . . . . . . . . . . . . . . 2 <br /> 3.0. SCOPE OF WORK . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2 <br /> 3.1. PERMITTING AND PRE-FIELD WORK ACTIVITIES . . . . . . . . . . . . . . . . . . . 3 <br /> 3.2. CPT DRILLING AND SAMPLE COLLECTION . . . . . . . . . . . . . . . . . . . . . . . . 4 <br /> 3.3. MONITORING WELL PILOT BORING ADVANCEMENT . . . . . . . . . . . . . . . 5 <br /> 3.4. WELL COMPLETION, DEVELOPMENT AND SURVEY . . . . . . . . . . . . . . . . 5 <br /> 3.5. GROUND WATER SAMPLE COLLECTION AND ANALYSIS . . . . . . . . . . . 5 <br /> 3.6. REPORT PREPARATION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6 <br /> 4.0. FIELD PROCEDURES . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6 <br /> 4.1. CPT SOIL BORINGS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6 <br /> 4.2. MONITORING WELL PILOT BORING ADVANCEMENT . . . . . . . . . . . . . . . 7 <br /> 4.3. MONITORING WELL INSTALLATION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7 <br /> 4.4. WELL DEVELOPMENT AND SURVEY . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8 <br /> 4.5. GROUNDWATER SAMPLING . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8 <br /> 4.5.1. Static Water Level Measurements . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8 <br /> 4.5.2. Well Evacuation . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> . . . . . . . . . . . . . . . . . . . 9 <br /> 4.5.3. Sample Withdrawal . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9 <br /> 4.5.4. Sample Handling . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9 <br /> 4.6. EQUIPMENT DECONTAMINATION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9 <br /> 4.7. BORING ABANDONMENT . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.