Laserfiche WebLink
E <br /> I = , <br /> I25 March 2005 <br /> . AGE-NC Project No 98-0540 <br /> IPage 4 of 4 <br /> 6.0. LIMITATIONS <br /> i , <br /> Our professional services were performed using that degree of care and skill ordinarily exercised by <br /> environmental consultants practicing in this or similar localities The findings were based upon field <br /> I measurements and analytical results provided by an independent Iaboratory Evaluations of the <br /> hydrogeologic conditions at the site for the purpose of this investigation are made from a limited <br /> i number of available data points (i a monitoring wells, ground water samples) and subsurface <br /> conditions may vary away from these data points No other warranty,expressed or implied, is made <br /> as to the professional interpretations, opinions and recommendations contained in this report <br /> i <br /> i <br /> I <br /> i ! <br /> I <br /> I <br /> I , <br /> IE <br /> I <br /> I <br /> A*aneed GcoEnwronmental,Inc <br /> I <br />