Laserfiche WebLink
i <br /> F � 1 <br /> F i 7 <br /> t � - <br /> per. <br />' MW-2 <br /> FORMER UST LOCATION 65 <br />' AL <br /> � � <br /> • <br /> B2 IM _3 <br /> ta55 s <br /> -Fe as -s a <br /> DISPENSER ISLANDS <br />' IN GROUND HYDRAULIC LIFT <br /> APPROXIMATE LOCATION OF SEPTIC SYSTEM • <br /> B4 <br /> TWO STAGE CLARIFIER P2 �A/C> <br /> FORMER WASTE OIL / <br /> DRAINAGE DITCH UST LOCATION <br /> rG� <br /> CGRASS <br /> cQ <br /> gA�4 <br /> I p� <br /> � gg <br /> l <br /> 1` 1 <br /> i ' y <br /> LEGEND - 20 APRIL 2000 <br /> 0Bz SOIL BORING LOCATION jfieT <br /> F <br /> MW-1 <br /> -1555 + MONITORING WELL LOCN <br /> LOCATION 'DESIGNATION AND ELEVATION <br /> A DOMESTIC WELL LOCATION <br /> SCALE <br /> —1555 — GROUND WATER ELEVATION CONTOUR LINE D 50 100 <br /> OOW GROUND WATER FLOW DIRECTION AND GRADIENT FEET <br /> I GROU <br /> ND WATER CONTOUR MAP A -4"va'c"'GeoEnvlronmental, Inc <br /> PACIFIC AUTO CENTER of Norlhera /ifarn.,r <br /> i 25355 NORTH HIGHWAY 99 PROJECT NO AGE—NC-98-0540 FILE PACAUT3FIGURE <br /> ACAMPO ' CALIFORNIA DATE 20 APRIL 2000 DRAWN BY MAC 3 <br />