Laserfiche WebLink
ATC SITE SAFETY PLAN <br /> MARK WORK ZONES ON SITE MAP O CHECK WHEN DONE. <br /> On-site communications: ❑ Radio EI Verbal ❑ Hand Signals <br /> ❑ Other <br /> Designate hand signals here: <br /> Off-site communications: ❑ Radio I]Telephone <br /> ❑ Other <br /> The specific signal for an emergency is: Verbally Given <br /> The specific signal for an evacuation is: Verbally Given <br /> Evacuation assembly point is: To be determined on-site riot to beginning <br /> work activities. <br /> MARK EVACUATION ROUTE(S) ON SITE MAP !]CHECK WHEN DONE <br /> SANITATION AND DECONTAMINATION <br /> II. Personnel Decontamination Procedure: Al_gloves and coveralls) will beecplaced ntive � a 5 Callon <br /> container with soil cuttin sif an . <br /> Location of Wash Water. Restroom on-site <br /> Location of Toilet: Restroom onsite <br /> Location of Drinking Water: ATC truck <br /> MARK LOCATION OF EYEWASH AND SHOWER DRENCH ON SITE MAP L7 CHECK WHEN <br /> DONE <br /> Equipment Decontamination Procedure: Equipment will be washed with a trisodium <br /> phosphate solution and/or steamcleaned. <br /> PAGE 11 <br /> 4 <br />