My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FIELD DOCUMENTS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
N
>
99 (STATE ROUTE 99)
>
6100
>
2900 - Site Mitigation Program
>
PR0515353
>
FIELD DOCUMENTS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 1:56:54 PM
Creation date
4/1/2020 2:20:57 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
FIELD DOCUMENTS
RECORD_ID
PR0515353
PE
2950
FACILITY_ID
FA0012099
FACILITY_NAME
ARCO STATION #595
STREET_NUMBER
6100
Direction
N
STREET_NAME
STATE ROUTE 99
City
STOCKTON
Zip
95209
CURRENT_STATUS
01
SITE_LOCATION
6100 N HWY 99
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
170
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
STATE OF CALIFORNIA DEPARTMENT OF TRANS 7ATION <br /> ENCROACHMENT PERMIT `iw Perm ..�. <br /> TR-0120(REV.6/20001 10 08 6 SV 0810 <br /> In compliance with(Check one): DisUCo/Rte/PM <br /> 10-SJ-99 PM 22.92 <br /> Date <br /> ® Your application of 12/16/2008 <br /> December 10, 2008 Fee Paid <br /> posit <br /> ❑ Utility Notice No. of 328 <br /> Performance Bond Amount(1) Payment Bond Amount <br /> ❑ Agreement No. of 21 <br /> 5000.00 0.00 <br /> and Company <br /> 1:3R/W Contract No. of Travelers Casualty and Surety Company <br /> of America <br /> Bond Number(1) Bond Number(2) <br /> 103172912159 <br /> TO: BP/Arco Remediation Management <br /> P.O. Box 1257 <br /> San Ramon, CA 94583 <br /> Attn: Sergio Morescalchi 925-275-3807 <br /> and subject to the following, PERMISSION IS HEREBY GRANTED to: PERMITTEE <br /> Install two (2) groundwater monitoring wells, maintain, and sample wells along State right <br /> of way at Hammer Lane northwest ramp and North Frontage Road (Highway 99) in the City of <br /> Stockton in San Joaquin County as shown on the attachment. Upon the completion of <br /> groundwater monitoring, the well will be abandoned by pressure grouting with near cement <br /> to the ground surface. The well drilling and installation may be conducted at night to <br /> reduce the impact of traffic. A copy of this permit shall be placed in the vehicles <br /> involved in doing this work. Permittee shall notify the State representative in the area <br /> before doing any work under this permit. This permit shall be renewed before expiration <br /> date. NO LANE SHALL BE CLOSED AT ANY TIME IN DOING THIS WORK. <br /> A pre-job meeting with the assigned Department Representative, Joe Valdez, 948-3656, is required prior <br /> to start of any work under this permit! Failure to do so may result in permit revocation with no <br /> prejudice. <br /> THIS PERMIT IS NOT A PROPERTY RIGHT AND DOES NOT TRANSFER WITH THE PROPERTY TO A NEW OWNER. <br /> The following attachments are also included as part of this permit(Check applicable): <br /> ®Yes ❑No General Provisions In addition to fee,the permittee will <br /> ❑Yes ®No Utility Maintenance Provisions be billed actual costs for: <br /> ®Yes ❑No Storm Water Special Provisions N Yes ❑NO Review <br /> ®Yes ❑No Special Provisions ®Yes ❑No Inspection <br /> ❑Yes ®No A Cal-OSHA permit, if required: Permit No. ®Yes ❑NO Field Work <br /> []Yes ®No As-Built Plans Submittal Route Slip for Locally Advertised Projects <br /> ®Yes ❑No Storm Water Pollution Prevention Plan t Water Pollution Control Plan (if any Caltrans effort expended) <br /> ❑Yes ®No The information in the environmental documentation has been reviewed and considered prior to <br /> approval of this permit. <br /> This permit is void unless the work is completed before December 31, 2010 <br /> This permit is to be strictly construed and no other work other than specifically mentioned is hereby authorized. <br /> No project work shall be commenced until all the other necessary permits and the environmental clearances have been obtained. <br /> PERMIT ENGINEER:Betty Tamae APPROVED: <br /> COPIES TO: <br /> Original-Permittee <br /> 2J metenance I A.Valdez <br /> 1-MainteKome Alias.District Director <br /> 1-file BY <br /> NELSON MAGSAYO,P.E.,District Permit Engineer <br /> FM 911436(D10 Permit App.) <br />
The URL can be used to link to this page
Your browser does not support the video tag.