Laserfiche WebLink
ARCADIS Ms. Lisa Medina <br /> June 22, 2012 <br /> 6.0 Reporting <br /> A report will be prepared to document the results of the pilot test activities. This <br /> report will include at a minimum the following: <br /> • Summary of site conditions and background information <br /> • A scaled site plan illustrating the extraction well and piezometer locations <br /> and other relevant site features <br /> • Documentation of field activities performed relevant to the pilot test <br /> • Geologic boring logs <br /> • Conclusions and recommendations relevant to the pilot test <br /> 7.0 Schedule <br /> ARCADIS is prepared to initiate fieldwork upon receiving San Joaquin County <br /> Environmental Health Department approval and receipt of the necessary permits. <br /> If you have any questions or comments regarding the contents of this report, please <br /> contact David Evans of ARCADIS at 916.985.2079 ext. 12 or by e-mail at <br /> David.Evans@arcadis-us.com or Sherrie Lang of ARCADIS at 916.985.2079 ext. 16 <br /> or by e-mail at Sherrie.Lang@arcadis-us.com. <br /> Sincerely, �OSAL aFa <br /> ARCADIS U.S., Inc. QQG <OQ� <br /> a <br /> Lha Freemen <br /> No:7368 <br /> Sherrie Lang pita D. Freeman, P. G., R.E.A. II * jI11WIa P <br /> Associate Project Manager Principal Geologist <br /> SOF cA4�4O <br /> Page: <br /> GVpgxfEM^HRCAMSYb LWnsmblWwF FY,u16VEpMMwkPIe,ICA-IX695M228P.BWPIMTwi1'ry 8/9 <br />