My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0005729
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
N
>
99 (STATE ROUTE 99)
>
6100
>
2900 - Site Mitigation Program
>
PR0515353
>
ARCHIVED REPORTS_XR0005729
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 1:50:32 PM
Creation date
4/1/2020 2:29:00 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0005729
RECORD_ID
PR0515353
PE
2950
FACILITY_ID
FA0012099
FACILITY_NAME
ARCO STATION #595
STREET_NUMBER
6100
Direction
N
STREET_NAME
STATE ROUTE 99
City
STOCKTON
Zip
95209
CURRENT_STATUS
01
SITE_LOCATION
6100 N HWY 99
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
64
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
S E C O R <br /> Date October 14, 2004 <br /> Quarter 3Q04 <br /> ARCO QUARTERLY GROUNDWATER MONITORING REPORT <br /> Facility No 595 Address 6100 N Highway 99, Stockton, CA <br /> Environmental Engineer Paul Supple <br /> Consulting Co/Contact Person SECOR/Cltnton Harms <br /> Consultant Project No 77BP 50595 04 0336 <br /> Primary Agency/Regulatory ID No San Joaquin County Public Health Services <br /> SJCPHS <br /> Assembly Bill 681 Status Property owned by Madeline Scannavino <br /> WORK PERFORMED THIS QUARTER (Third Quarter- 2004): <br /> 1 Performed groundwater monitoring and sampling (including onsite water supply well WSW, offsite <br /> water supply well DW-2) <br /> 2 Prepared and submitted July, August, and September monthly system performance summary <br /> 3 Maintained water treatment system at Weinerschnitzei <br /> WORK PROPOSED FOR NEXT QUARTER (Fourth Quarter- 2004): <br /> 1 Perform quarterly groundwater monitoring and sampling (including WSW and DW-2) <br /> 2 Prepare and submit quarterly groundwater monitoring report <br /> 3 Prepare and submit monthly system performance summary for October, November, <br /> and December <br /> 4 Conduct additional site assessment pending receipt of access agreement <br /> QUARTERLY RESULTS SUMMARY <br /> Current Phase of Project Monitoring/Offsite Remediation <br /> Frequency of Groundwater <br /> Sampling MW-1 through MW-10, DMW-1 through DMW-3, WSW, <br /> and DW-2 sampled quarterly <br /> DW-1 influent and effluent sampled monthly <br /> Frequency of Groundwater <br /> Monitoring Quarters <br /> Is Free Product (FP) Present <br /> Onsite No <br /> Current Remediation Techniques Granular activated carbon treatment on off-site well DW-1 <br /> Approximate Depth to <br /> Groundwater 65 98 to 70 69 ft <br /> Shallow Groundwater Northwest @ 0 011 ft/ft and a local cone of depression toward <br /> Flow/Gradient MW-7 and MW-4 0 006 ft/ft, 0 003 ft/ft, and 0 016 ft/ft <br /> Deep Groundwater Flow/Gradient Northwest 0 0 003 ft/ft <br /> DISCUSSION. <br /> Total petroleum hydrocarbons as gasoline (TPHg) were reported in one of the eleven monitoring wells <br /> sampled this quarter at a concentration of 1,900 parts per billion (MW-1) Benzene was reported in three <br /> of the eleven monitoring wells sampled at concentrations of 0 53 ppb (MW-3) to 570 ppb (MW-1) Methyl <br /> tert-butyl ether (MtBE), analyzed using EPA Method 82606, was detected in seven of the eleven wells <br /> sampled at concentrations ranging from, 2 6 ppb (MW-3) to 86 ppb (DMW-3) 1,2-dichloroethane (1,2- <br /> -'"1', <br /> 11ARC0105951QMRs120M3QMR04 doc v�V <br />
The URL can be used to link to this page
Your browser does not support the video tag.