My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0005734
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
N
>
99 (STATE ROUTE 99)
>
6100
>
2900 - Site Mitigation Program
>
PR0515353
>
ARCHIVED REPORTS_XR0005734
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 1:50:32 PM
Creation date
4/1/2020 2:32:35 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0005734
RECORD_ID
PR0515353
PE
2950
FACILITY_ID
FA0012099
FACILITY_NAME
ARCO STATION #595
STREET_NUMBER
6100
Direction
N
STREET_NAME
STATE ROUTE 99
City
STOCKTON
Zip
95209
CURRENT_STATUS
01
SITE_LOCATION
6100 N HWY 99
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
JOB NAME ARCO 595 JOB NUMBER 77BP 50595 04 032 <br /> CONTACT 6100 N Highway 99 START DATE 05LQ8.7V3 <br /> ADDRESS Stockton CA DATE PREPARED 03/26/03 <br /> PREPARED FOR Steve Thompson PREPARED BY Krissy Flesoras <br /> SECOR- Sacramento WORK REQUEST FORM <br /> Install Pressure Transducers/Data Loggers in Selected Wells To Monitor Influence of Pumping <br /> Frbm The Onsite Domestic Well on Groundwater Levels <br /> 1) After arnvin on-site, 1 review HASP 2 show our ass ort to station manager 3 conduct H&S Pow-Wow with <br /> station manager and 4 sign HASP Check in w/Rusty or Krissy when you get to the site <br /> 2 Gau e water levels in shallow water-bearing zone wells MW-3 MW-4 and MW-7 and dee er water-bearino zone <br /> wells DMW-1 through DMW-3 Record baseline water levels on the attached sheet <br /> 3) Install pressure transducers/data loggers in wells MW-3 MW-4 and MW-7 Set data loggers approximately 2 feet <br /> below the recorded depth to water Make sure that data loggers are recording water levels at i-minute intervals <br /> 4 Leave sn data loggers for a 96-hour period <br /> 5) Return to the site on Friday 5/9 to remove the data IoQ2ers After you remove the data loggers measure depth to <br /> water in wells MW-3 MW-4 MW-7 and wells DMW-1 -DMW-3 Record water levels on the attached data sheet <br /> 6) Decontaminate data€oggerSprior to returning them to Knssy in the office <br /> 7 Call Rusty/Kr:ssy in the office prior to leaving the site <br /> 8) Fill out enclosed equipment billing sheet and submit with field notes <br /> 9 Leave field data sheets with Knssy in Sacramento <br /> k <br /> rkUIPMENT NEEDED <br /> HASP <br /> 1/2" 9/16" and 15/16"sockets, and other misc tools <br /> Pressure Transducers/Data Loggers Global Water <br /> Water Level Meter <br /> TENERAL INFORMATION c <br /> Direct all questions to Rus 916 861-0400 x229 <br />
The URL can be used to link to this page
Your browser does not support the video tag.