Laserfiche WebLink
MW-8 <br /> ORCHARD <br /> k <br /> MW-6 <br /> DIRTIGRASS <br /> s <br /> MW-5 <br /> i <br /> HAMMER LANE <br /> MW 2 <br /> PUMP q <br /> ISLANDS <br /> 0 PSB-2 CD CD •B-1 = <br /> U <br /> O <br /> LOCATION OF WELL HEAD I DMW(at ant 1+ • AC <br /> TREATMENT SYSTEM DMW B-2 <br /> (-31 44) ac _ <br /> MW-4 PAVING <br /> DW-1 • + 5 I <br /> MW-9 _ � � UST f <br /> 3 0 0 } STATION COMPLEX MW-1 <br /> BUILDING <br /> PUMP <br /> ISLANDS <br /> .32 Q 0 B-3 <br /> PAVED DMW-2 <br /> AREA (-32.28) "" AC <br /> 4~ AC PAVING <br /> p PSB-1. MW-3 PAVING I <br /> Q7J WATER WELL <br /> WIENERSCHNaZEL <br /> Nz <br /> ORCHARD <br /> AUTO FACTORY 0 DW-2 <br /> Y <br /> MW-10 <br /> LEGEND <br /> - - — -- MW-1 SHALLOW GROUNDWATER MONITORING WELL <br /> DMW-1 DEEP GROUNDWATER MONITORING WELL <br /> • Bi SOIL BORING <br /> O DWI DOMESTIC WELL <br /> DENNY BOY APPROXIMATE GROUNDWATER <br /> RESTAURANT FLOW DIRECTION AND GRADIENT,F17FT <br /> "320 GROUNDWATER ELEVATION CONTOUR <br /> � (FEET ABOVE MEAN SEA LEVEL) <br /> (-3228) GROUNDWATER ELEVATION <br /> (FEET ABOVE MEAN SEA LEVEL) <br /> cc <br /> CL <br /> B <br /> u� <br /> a <br /> N <br /> w <br /> cn <br /> a <br /> r <br /> a <br /> !u <br /> 0 <br /> REFERENCE THIS FIGURE IS BASED ON A"SITE PLAN'PROVIDED <br /> Lu <br /> BY MORROW SURVEYING,AND A FIELD SKETCH AND IS 0 50 140 <br /> INTENDED FOR ILLUSTRATION ONLY hmmmmmmmmol <br /> rn APPROXIMATE SCALE FEET <br /> 3 <br /> `n DRAWN <br /> APpR PR FIGURE 2 <br /> 3 RB ARCO SERVICE STATION#595 <br /> q REV DATE 6100 NORTH HIGHWAY 99 <br /> Q O R 25MAR2003 STOCKTON,CALIFORNIA <br /> S E <br /> 3 JOB NO DEEP ZONE GROUNDWATER ELEVATION CONTOUR MAP <br /> 77BP 50595 02 0336 JANUARY 17,2003 <br />