Laserfiche WebLink
I <br /> S P E C I A L P R O V I S I O N S <br /> Winter Weather Utility Work <br /> 1 . SUPERVISION: The utility company (permittee) shall furnish <br /> u --tMe supervision of all work. to insure full compliance <br /> with the permit provisions. <br /> 2. START 'OF WORK: No work within the County right of way shall <br /> Be sF4r--ted until the utility company representative has made <br /> an evaluation of weather conditions and' has d6termined the <br /> work can be accomplished under the provisions of the permit, <br /> 3. CLEAN PAVEMENT: Dirt and mud shall not be deposited on the <br /> pavement outside the area of work, and if inadvertently track- <br /> ed <br /> racked onto the road travelway shall be removed immediately. <br /> 4, DAILY RESTORATION: Private driveways and road intersections <br /> ghall be restoreff daily. <br /> 5. WEATHER-TIGHT CONDITION: All trenches shall be filled and <br /> compacted, itc es an other drainage facilities regraded <br /> and opened, and the entire work area restored to weather- <br /> tight condition prior to any rain. <br /> to <br /> J� <br /> Engineering Form <br />