My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0005739
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
N
>
99 (STATE ROUTE 99)
>
6100
>
2900 - Site Mitigation Program
>
PR0515353
>
ARCHIVED REPORTS_XR0005739
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 1:50:32 PM
Creation date
4/1/2020 2:36:24 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0005739
RECORD_ID
PR0515353
PE
2950
FACILITY_ID
FA0012099
FACILITY_NAME
ARCO STATION #595
STREET_NUMBER
6100
Direction
N
STREET_NAME
STATE ROUTE 99
City
STOCKTON
Zip
95209
CURRENT_STATUS
01
SITE_LOCATION
6100 N HWY 99
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
127
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> S P E C I A L P R O V I S I O N S <br /> Winter Weather Utility Work <br /> 1 . SUPERVISION: The utility company (permittee) shall furnish <br /> u --tMe supervision of all work. to insure full compliance <br /> with the permit provisions. <br /> 2. START 'OF WORK: No work within the County right of way shall <br /> Be sF4r--ted until the utility company representative has made <br /> an evaluation of weather conditions and' has d6termined the <br /> work can be accomplished under the provisions of the permit, <br /> 3. CLEAN PAVEMENT: Dirt and mud shall not be deposited on the <br /> pavement outside the area of work, and if inadvertently track- <br /> ed <br /> racked onto the road travelway shall be removed immediately. <br /> 4, DAILY RESTORATION: Private driveways and road intersections <br /> ghall be restoreff daily. <br /> 5. WEATHER-TIGHT CONDITION: All trenches shall be filled and <br /> compacted, itc es an other drainage facilities regraded <br /> and opened, and the entire work area restored to weather- <br /> tight condition prior to any rain. <br /> to <br /> J� <br /> Engineering Form <br />
The URL can be used to link to this page
Your browser does not support the video tag.