Laserfiche WebLink
e1of2 ` <br /> Table 1 <br /> Groundwater Elevation and Analytical Data _ <br /> ARCO Service Station#595 <br /> 6100 N Highway 99,Stockton,CA <br /> Well Depth Groundwater Groundwater Ethyl- Xylenes MtBE MtBE <br /> Well Date Elevation to Water Elevation Elevation TPHg Benzene Toluene benzene (total) (EPA 8020) (EPA 8260) DO <br /> Number Sampled (it,MSL) (ft,TOC) (ft,MSL) Change(ft) (ppb) (ppb) (ppb) (ppb) (ppb) (ppb) (ppb) (mg(L) <br /> MW-1 6/16/00 NP 3555 5765 -2210 -- 1,340 734 669 9 45 164 <12 5 <2 0 <br /> 9/19/00 NP 6068 -2513 -303 2,990 189 182 67 6 115 <50 0 242 0 3 <br /> 1112/00 P 6074 -2519 -006 3,000 258 46 7 105 196 <25 0 2 5 2 9 <br /> 3/5101 P 60 90 -2535 -016 4,250 479 686 208 386 203 128 52 <br /> 5/8/01 P 6140 -2585 -050 2,130 179 109 590 914 771 4 59 043 <br /> 811101 P 6317 -27 62 -177 120 2 5 <0 50 <0 50 <0 50 2 8 12 1 53 <br /> 10/23/01 P 64 53 -2898 -136 770* <5 0 <5 0 <5 0 <5 0 39 3 7 030 <br /> 211102 P 6394 -2839 069 520* 15 1 1 14 <0 50 29 31 0 53 <br /> MW-2 6/16100 NP 3294 5572 -2278 -- 655 28 0 882 2 58 194 179 116 <br /> 9119100 NP 58 43 -2549 -271 495 3 64 <0 50 <0 50 145 760 93 6 0 6 <br /> 11/2/00 P 59 42 -26 48 -0 99 428 126 <0 50 177 204 80 8 71 2 8 <br /> 3/5/01 P 5839 -25 45 1 03 476 28 7 108 837 277 740 601 4 9 <br /> 518101 P 5905 -2611 -066 315 135 0 638 2 85 148 778 998 0 46 <br /> 811/01 P 6098 -2804 -193 630 59 61 11 16 60 76 1 36 <br /> 10/23/01 P 6234 -2940 -136 590* 57 2 8 7 0 4 7 88 65 026 <br /> i <br /> 211/02 P 6233 -2939 0 01 280 14 17 2 6 3 9 79 66 030 <br /> MW-3 6/16/00 NP 3361 56 35 -2274 -- 226 289 <0 50 2 84 102 929 869 -- <br /> 9/19/00 NP 5901 -2540 -266 217 0 582 <0 50 <0 50 <0 50 <2 5 <2 0 0 5 <br /> 1112100 P 5911 -25 50 -010 162 <0 50 <0 50 <0 50 <0 50 120 11 13 <br /> 3/5101 P 5902 -2541 009 178 <0 500 <0 500 <0 500 0 732 4 43 7 35 5 6 <br /> 5/8101 P 5975 -2614 -073 166 0 515 <0 500 <0 500 0 711 2 96 3 93 060 <br /> 811/01 P 6156 -2795 -181 220 073 <0 50 <0 50 <0 50 <2 5 <2 0 105 <br /> 10/23/01 P 62 91 -2930 -135 130* <0 50 <0 50 <0 50 <0 50 15 11 1 15 <br /> 211/02 P 62 23 -2862 068 92* 1 1 <0 50 11 051 6 6 43 0 74 <br /> MW-4 6/16/00 NP 33 77 56 56 -2279 -- 8,910 2,310 <0 50 839 1,520 3,680 3,200 -- <br /> 9/19100 NP 5924 -25 47 -268 18,900 2,240 <20 0 693 2,230 2,240 2,510 0 4 <br /> 11/2/00 P 5859 -2482 065 9,230 1,740 <50 0 154 951 1,990 2,200 17 <br /> 3/5/01 P 5917 -2540 058 5,250 738 <20 0 33 5 <20 0 1,870 1,760 42 <br /> 5/8/01 P 5984 -2607 -067 2,890 875 <20 0 344 <20 0 2,350 2,140 050 <br /> 811/01 P 6183 -2806 -199 750 19 <2 5 6 6 <2 5 640 1,400 000 <br /> 10/23/01 - - -----------------------------------------Dry Well----------------- ------------------ <br /> 211102 P 6158 -2781 — <500 <5 0 <5 0 <5 0 <5 0 770 690 028 <br /> Projects/ARCO/595/Reports ables/gwtables595 As <br />