My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0005744
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
N
>
99 (STATE ROUTE 99)
>
6100
>
2900 - Site Mitigation Program
>
PR0515353
>
ARCHIVED REPORTS_XR0005744
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 1:50:32 PM
Creation date
4/1/2020 2:43:55 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0005744
RECORD_ID
PR0515353
PE
2950
FACILITY_ID
FA0012099
FACILITY_NAME
ARCO STATION #595
STREET_NUMBER
6100
Direction
N
STREET_NAME
STATE ROUTE 99
City
STOCKTON
Zip
95209
CURRENT_STATUS
01
SITE_LOCATION
6100 N HWY 99
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
38
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• Date October 29,2001 <br /> Quarter 3Q01 <br /> ARCO QUARTERLY GROUNDWATER MONITORING REPORT <br /> Facility No 595 Address 6100 N Highway 99,Stockton,CA <br /> ARCO Environmental Engineer Paul Supple <br /> Consulting Co/Contact Person SECOR/Rusty Benkosky <br /> Consultant Project No 077 43 130 703 <br /> Primary Agency/Regulatory ID No San Joaquin County Public Health Services <br /> (SJCPHS) <br /> Assembly Bill 681 Status Property owned by Madeline Scannavino <br /> WORK PERFORMED THIS QUARTER (Third Quarter - 2001): <br /> 1 Performed groundwater monitoring and sampling(including onsite water supply well,WSW) <br /> 2 Prepared and submitted quarterly groundwater monitoring report <br /> 3 Performed additional site assessment <br />. WORK PROPOSED FOR NEXT QUARTER (Fourth Quarter - 2001): <br /> 1 Perform quarterly groundwater monitoring and sampling(including WSW) <br /> 2 Prepare and submit quarterly groundwater monitoring report <br /> 3 Prepare and submit report documenting additional site assessment <br /> QUARTERLY RESULTS SUMMARY <br /> Current Phase of Project Monitoring <br /> Frequency of Groundwater Sampling MW-1 through MW-7 and WSW-1 sampled quarterly <br /> Frequency of Groundwater Monitoring Quarterly <br /> Is Free Product(FP)Present Onsite No <br /> FP Recovered this Quarter NA <br /> Cumulative FP Recovered to Date NA <br /> Current Remediation Techniques NA <br /> Approximate Depth to Groundwater 58Y2-63V4 ft <br /> Groundwater Flow and Gradient Northwest @ 0 002 fdit <br /> DISCUSSION: <br /> Total petroleum hydrocarbons as gasoline(TPHg) were reported in four of the seven wells sampled this quarter at <br /> concentrations ranging from 120 ppb(MW-1)to 750 ppb(MW-4) Benzene was reported in four of the seven wells <br />. at concentrations ranging from 0 73 ppb(MW-3)to 59 ppb(MW-2) Methyl tert-butyl ether(MtBE),analyzed <br /> using EPA Method 8260A,was detected in five of the seven wells at concentrations ranging from 2 6 ppb(MW-5) <br /> to 1,400 ppb(MW-4) Di-isopropyl ether(DIPE) was reported in one of the seven wells at a concentration of 2 2 <br /> i <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.