Laserfiche WebLink
D. Detailed Description of Specific Tasks Planned (Number each separate task in order of <br /> progression The task numbers assigned here will be referred to throughout the Plan) <br /> I _ ail-Grnte" Safety Meeting <br /> 2 Ohcervation of drilling activities- <br /> 3 Collect soil snmp]es and log soil type--,, <br /> III.WASTE CHARACTERISITCS <br /> A. Task Specific Hazards: <br /> TASK HAZARD RATING IDENTIFIED/ <br /> ANTICIPATED <br /> HAZARDS <br /> 1 Utility clearance Low Contact with hazardous waste,slipping or tripping, <br /> noise,residuals handling,heavy equipment <br /> excavation,traffic <br /> 2 Observe drill and well construction Low-Moderate Contact with hazardous waste,slipping or tripping, <br /> activities noise,residuals handling,heavy equipment <br /> excavation,traffic <br /> 3 Collecting soil samples Low-Moderate Contact with hazardous waste,slipping or tripping, <br /> noise,residuals handling,heavy equipment <br /> excavation,traffic <br /> B. Overall Hazard Rating: (Unknown, low,moderate, serious,or extreme) <br /> i ow-moderate <br /> C U SUNKPULL HSP <br /> -5- <br />