Laserfiche WebLink
ARCO Products Company 0 4 <br /> ARCO Service Station#595 6100 North Highway 99,Stockton,CA February 28 2000 <br /> Field and laboratory procedures are presented as Attachment C <br /> SCHEDULE <br /> SECOR is prepared to initiate field work within 2 weeks following approval of this work <br /> plan and issuance of permits by the SJCEHD A report documenting the findings of the <br /> soil boring installation is anticipated to be submitted approximately 6 to 8 weeks after <br /> the completion of the field work and upon receipt of all analytical data <br /> If there are any questions regarding the contents of this work plan, please call us at (916) <br /> 364-1880 <br /> Sincerely, <br /> SECOR International Incorporated <br /> _ QaQFESSIQ <br /> Rusty Benkos y, P NO C 058399 <br /> Associate Engine r CC <br /> Exp 31-oZ <br /> CML <br /> 0 Y SOF CALIF�Q� <br /> Greg Barclay, RG 6 60 <br /> Technical Coordin or <br /> Attachments Figure 1 - Site Location Map <br /> Figure 2 - Site Plan with Proposed Boring Locations <br /> Attachment A - SCEMD Letter, dated January 25, 2000 <br /> Attachment B - Site Specific Health and Safety Plan <br /> Attachment C - Field and Laboratory Procedures <br /> cc Mr Paul Supple, ARCO Products Company <br /> Mr Marty Hartzell, RWQCB <br /> Ms Madaline Scannavion, Scannavion Properties, Stockton, CA <br /> 077 419413 1 O/WPLAN2 <br />