My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
N
>
99 (STATE ROUTE 99)
>
5942
>
3500 - Local Oversight Program
>
PR0515482
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 1:57:04 PM
Creation date
4/1/2020 3:03:02 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0515482
PE
2950
FACILITY_ID
FA0012177
FACILITY_NAME
AUTO FACTORY
STREET_NUMBER
5942
Direction
N
STREET_NAME
STATE ROUTE 99
City
STOCKTON
Zip
95212
CURRENT_STATUS
01
SITE_LOCATION
5942 N HWY 99
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
45
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
t <br /> Q <br /> CHRONOLOGY <br /> THE AUTO FACTORY <br /> 5942 N. HIGHWAY 99 E. FRONTAGE ROAD <br /> STOCKTON, CA 95212 <br /> 10/19/99 An environmental site assessment was performed this date. The work <br /> was conducted pending construction on the freeway interchange. Three <br /> soil borings were installed in the former tank pit, one extended to 60 feet <br /> below surface grade (bsg) to collect a grab groundwater sample. One <br /> boring, ECG-3 had detections of soil contamination. The water sample <br /> from ECG-2 had 173 ppb TPHd. See Espana Geotechnical Consulting <br /> report dated November 17, 1999. <br /> 01/21/00 An Unauthorized Release Report #00-U04 and a Notification of <br /> Hazardous Waste Discharge #00-012 were filed on this date. <br /> 01/31/00 A Notice of Responsibility and an Environmental Health Department letter <br /> about the Local Oversight Program were sent to the property owners, <br /> Dick & Belinda Mar, on this date. <br /> 06/26/00 Groundwater monitoring well MW-1 (screened from 49 to 69 feet) was <br /> installed on this date. The well was developed and sampled on July 3, <br /> 2000; analytical results were non-detect for all constituents analyzed. <br /> See Advanced GeoEnviron mental Inc. "Preliminary Site Assessment <br /> Report— September 2000", dated October 2, 2000. <br /> 08/31/07 A site visit was made this date to sample the monitoring well again, but <br /> the water table had dropped and the well was dry. <br /> 08/14/08 This is the date of the most recent sampling of the onsite domestic well. <br /> The well is sampled quarterly as part of the investigation of former ARCO <br /> Station #595 located across the street at 6100 N. Highway 99. Analytical <br /> results were reported as non-detect. <br /> 12/19/08 The site was evaluated for possible closure; site data was compared with <br /> the San Francisco Bay Regional Water Quality Control Board <br /> Environmental Screening Levels. The site passes the ESL criteria. <br /> i <br /> I <br /> I <br /> I <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.