My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
N
>
99 (STATE ROUTE 99)
>
5942
>
3500 - Local Oversight Program
>
PR0515482
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 1:59:15 PM
Creation date
4/1/2020 3:03:44 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
WORK PLANS
RECORD_ID
PR0515482
PE
2950
FACILITY_ID
FA0012177
FACILITY_NAME
AUTO FACTORY
STREET_NUMBER
5942
Direction
N
STREET_NAME
STATE ROUTE 99
City
STOCKTON
Zip
95212
CURRENT_STATUS
01
SITE_LOCATION
5942 N HWY 99
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
31 March 2000 <br /> AGE-NC Project No. 00-0699 <br /> Page 8 of 9 <br /> through tremmie pipe. The PHS-EHD will be notified for grout inspection at least 48-hours prior to <br /> conducting grouting procedures. <br /> Following completion of the monitoring wells, well elevations and locations will be surveyed by a <br /> California-licensed surveyor. <br /> 4.4. WELL DEVELOPMENT <br /> Development will consist of a combination of bailing to remove the major portion of fine-grained <br /> sediment from inside the well, surging to flush out or draw in sediment from the filter pack, and <br /> additional bailing to finish the removal of sediment.Development activities will be continued until <br /> the purged water is essentially sediment free. <br /> 4.5. GROUND WATER MONITORING WELL SAMPLING <br /> Ground water sample collection will be performed in accordance with PHS-EHD sampling <br /> protocols. <br /> 4.5.1. Static Water Level Measurements <br /> Before sampling and during groundwater monitoring,the static water level will be measured using <br /> an electric water level indicator. Water level data will be recorded to the nearest 0.01 foot from a <br /> reference point marked of the top of the PVC well casing. Before and after each _use, the <br /> measurement device will be rinsed with water. <br /> 4.5.2. Well Evacuation _ <br /> Subsequent to measurement of depth to water and prior to sampling, the well will be purged-using <br /> a submersible pump or a disposable bailer to ensure that the sample is representative of the <br /> formation,rather than water standing in the well casing.The well will be purged until: 1)a minimum <br /> of three casing volumes is removed from the well; and/or 2) the field-measured ground water <br /> parameters have stabilized. However, if a well is purged dry prior to evacuating three casing <br /> volumes, a ground water sample will be collected following 80 percent recovery of ground water <br /> within the well or within 8-hours of well evacuation. <br /> Advanced GeoEnvironmental,Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.