Laserfiche WebLink
CONTENTS <br /> 1.0 PURPOSE AND SCOPE 1-1 <br /> 2.0 RESPONSIBILITIES AND QUALIFICATIONS 2-1 <br /> 3.0 PROCEDURE FOR SAMPLING SOIL AND GROUNDWATER USING <br /> HOLLOW-STEM AUGERS 3-1 <br /> 3.1 LIST OF NECESSARY EQ UIIPMENT 3-1 <br /> 3.2 PROCEDURE 3-2 <br /> 3.2.1 Soil Samples 3-2 <br /> 3.2.2 Boring Completion---Grouting and Cuttings Disposal 3-3 <br /> 4.0 SAMPLE HANDLING 4-1 <br /> 4.1 SAMPLE CONTAINERS, IDENTIFICATION, AND LABELING 4-1 <br /> 4.1.1 Sample Containers 4-1 <br /> 4.1.2 Sample Identification 4-1 <br /> 4.1.3 Sample Labeling 4-1 <br /> 4.2 SAMPLE PRESERVATION AND HANDLING 4-1 <br /> 4.2.1 Sample Preservation 4-1 . <br /> 4.2.2 Sample Handling 4-2 <br /> 4.2..21 Packing and Storage 4-2 <br /> 4.2.2.2 Transportation 4-2 <br /> 4.3 SAMPLE TRACKING 4-3 <br /> 4.4 QAIQC SAMPLES 4-3 <br /> 4.41 Trip Blanks 4-3 <br /> 4.4.2 Field Blanks 4-4 i <br /> 4.4.3 Field Duplicates 4-4 <br /> 4.4.4 Decontamination and Rinsate Samples 4-4 <br /> 4.4.5 Matrix SpikelMatrix Spike Duplicate for Soil Samples 4-4 <br /> 5.0 EQUIPMENT DECONTAMINATION 5-1 <br /> 5.1 ESTABLISHING DECONTAMINATION ZONES 5-1 <br /> 5.2 SAMPLE EQUIPMENT DECONTAMI7VA17ONPROCEDURE 5-1 <br /> 5.3 DRILLING AND HEAVY EQUIPMENT DECONTAMINATION <br /> PRO CED URES 5-2 <br /> 6.0 DOCUMENTATION 6-1 <br /> 7.0 QUALITY ASSURANCE REQUIREMENTS 7-1 <br /> 7.1 DATA QUALITY OBJECTIVES 7-1 <br /> 7.2 AUDITS AND SCHEDULE 7-1 <br /> 7.3 NONCONFORMANCES AND CORRECTIVE ACTION 7-2 <br /> 11 � <br />