Laserfiche WebLink
REVISED MONITORING AND REPORTING PROGRAM NO. 91-223 -4- <br /> CANANDAIGUA WINE COMPANY <br /> SAN JOAQUIN COUNTY <br /> REPORTING <br /> In reporting monitoring data, the Discharger shall arrange the data in tabular form so that the date, <br /> sample type (e.g., effluent, groundwater well, etc.), and reported analytical result for each sample are <br /> readily discernible. The data shall be summarized in such a manner to clearly illustrate compliance with <br /> waste discharge requirements and spatial or temporal trends, as applicable. The results of any <br /> monitoring done more frequently than required at the locations specified in the Monitoring and <br /> Reporting Program shall be reported in the next scheduled monitoring report. <br /> As required by the California Business and Professions Code Sections 6735, 7835, and 7835.1, all <br /> groundwater monitoring reports shall be prepared under the direct supervision of a California licensed <br /> Registered Engineer or Geologist and signed by the registered professional. <br /> A. Monthly Monitoring Reports <br /> Monthly reports shall be submitted to the Regional Board on the 1St day of the second month following <br /> sampling (i.e. the January Report is due by 1 March). At a minimum, the reports shall include: <br /> 1. Results of winery/distillery effluent, flow, leachfield, cooling water, and land application area <br /> monitoring. <br /> 2. Land application log book entries and calculations. <br /> 3. A comparison of monitoring data to the effluent limitations and an explanation of any violation <br /> of those requirements. Data shall be presented in tabular format. <br /> 4. If requested by staff, copies of laboratory analytical report(s). <br /> B. Quarterly Monitoring Reports <br /> The Discharger shall establish a quarterly sampling schedule for groundwater monitoring such that <br /> samples are obtained approximately every three months. Quarterly monitoring reports shall be <br /> submitted to the Board by the 1St day of the second month after the quarter (i.e. the January-March <br /> quarter is due by May 1S) and may be combined with the monthly report. The Quarterly Report shall <br /> include the following: I. <br /> 1. The contents of a regular monthly report. <br /> 2. A narrative description of all preparatory, monitoring, sampling, and analytical testing activities <br /> for the groundwater monitoring. The narrative shall be sufficiently detailed to verify compliance <br /> with the WDRs, this MRP, and the Standard Provisions and Reporting Requirements. The <br /> narrative shall be supported by field logs for each well documenting depth to groundwater; <br /> parameters measured before, during, and after purging; method of purging; calculation of the <br /> casing volume; and total volume of water purged. <br />