Laserfiche WebLink
Paul Franzia - 2 - 14 November 2003 <br /> of the lysimeters is to characterize the treatment effectiveness of the land application area to allow <br /> preparation of effluent limits. Delaying installation of the lysimeters, or overloading the land <br /> application area will not provide data useful in establishing the treatment capacity. <br /> Barrel Ten should be aware that proceeding with the workplan as proposed may result in generation of <br /> data that will be of limited use in preparation of the RWD required by the C&D Order No. R5-2003- <br /> 0125. If you have any questions on this information, please telephone meat (916) 255-3116. <br /> TIMOTH R. O'BRIEN <br /> Waste Discharge to Land Unit <br /> cc: Mike Huggins, San Joaquin County Environmental Health Department, Stockton <br /> Robert Chrobak, Kennedy Jenks Consultants, San Francisco <br /> VASan_loaquin_Non I S�SIaWbrirnTSan loaquin\Barrd Tw Es Ion Winaffranzia 14 Nov 03.doc <br />