|
Kennedy/Jenks Consultants
<br /> Table 5: Groundwater pH, EC, TDS, and Nitrogen Speciation
<br /> Analytical Results
<br /> EC(a) TDS(" NO3-N(`) NO2-N(d) TKN(e) NH3-N TN(f)
<br /> pH µS/cm(9) Mg/I(1) mg/I mg/I mg/I mg/I mg/I
<br /> MW-4 1/7/03 6.5 2,200 1,600 2 NA 1 <1 3
<br /> Cont'd 4/4/03 6.6 2,000 1,400 4 NA <1 NA 4
<br /> 8/28/03 6.6 1,900 1,100 2 NA <1 NA-2
<br /> 11/4/03 6.8 1,900 1,500 1 NA <1 NA 1
<br /> 2/19/04 6.7 1,900 1,400 3 0.47 <1 <1 4
<br /> 5/27/04 6.6 1,900 1,400 4 <0.3 <1 NA 4
<br /> 8/14/04 6.3 2,000 1,400 4 <0.3 <1 NA 4
<br /> 11/16/04 6.6 2,100 1,400 4 <0.91 1 NA-5
<br /> MW-5 10/16/01 6.8 1,800 1,100 4 NA <2 NA 4
<br /> 1/14/02 6.8 1,510 1,000 5 NA <2 NA 4
<br /> 4/12/02 6.7 1,500 890 7 NA <2 NA 7
<br /> 7/24/02 6.9 1,600 990 6 NA <2 NA 6
<br /> 10/29/02 6.8 NA 1,100 5 NA 2 NA 7
<br /> 1/7/03 6.7 1,800 1,100 6 NA 2 <1 8
<br /> 4/4/03 6.9 -1,700 1,100 7 NA 1 NA 8
<br /> 8/28/03 6.8 1,400 980 7 NA <1 NA 7
<br /> 11/4/03 7.0 1,400 980 10 NA <1 NA 10
<br /> 2/19/04 6.7 1,500 980 6 0.68 <1 <1 7
<br /> 5/27/04 6.7 1,700 1,100 5 <0.3 <1 NA 5
<br /> 8/14/04 6.5 1,800 1,200 5 <0.3 <1 NA 5
<br /> 11/16/04 6.8 1,900 1,200 4 <0.91 1.5 NA 6
<br /> MW-6 2/19/04 6.4 970 660 41 0.52 <1 <1 41
<br /> 5/27/04 6.4 970 680 17 <0.3 <1 NA 17
<br /> 8/14/04 6.4 990 680 41 <0.3 <1 NA 41
<br /> 11/16/04 6.5 950 570 38 <0.3 <1 NA 38
<br /> MW-7 2/19/04 6.4 1,700 1,100 68 0.43 <1 <1 69
<br /> 5/27/04 6.2 1,600 1,100 10 <0.3 <1 NA 10
<br /> 8/14/04 6.1 1,600 1,100 17 <0.3 <1 NA 17
<br /> 11/16/04 6.4 1,600 1,000 47 2.2 <1 NA 50
<br /> (a) EC = Electrical Conductivity
<br /> (b) TDS =Total Dissolved Solids
<br /> (c) NO3-N =Nitrate as Nitrogen
<br /> (d) NO2-N =Nitrite as Nitrogen
<br /> (e) TKN =Total Kjeldahl Nitrogen
<br /> (f) TN =Total Nitrogen
<br /> (g) µS/cm = microsiemens per centimeter
<br /> (h) mg/I =milligrams per liter
<br /> (i) NA= Not Analyzed
<br /> (j) < = No detection above the stated laboratory detection limit.Analysis for sample by Twining
<br /> Laboratories, Inc. of Fresno, California (State Certification No. 1371).
<br /> Groundwater Investigation Work Plan Page 2 of 2
<br /> Barrel Ten Quarter Circle Winery, Escalon, California
<br /> PIIS-Pro1120031030118.08_BTQCLCIWorkPlanslGW investigationMar061TableslTable05.doc
<br />
|