My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
O
>
120 (STATE ROUTE 120)
>
21801
>
2900 - Site Mitigation Program
>
PR0516259
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 4:01:48 PM
Creation date
4/1/2020 3:39:00 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0516259
PE
2960
FACILITY_ID
FA0012534
FACILITY_NAME
BARREL TEN QUARTER CIRCLE LAND CO
STREET_NUMBER
21801
Direction
E
STREET_NAME
STATE ROUTE 120
City
ESCALON
Zip
95320
APN
20525002
CURRENT_STATUS
01
SITE_LOCATION
21801 E HWY 120
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
186
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Kennedy,Aenks Consultants <br /> Section 1: Hazard Appraisal and Recognition Plan (HARP) <br /> Summary <br /> Project Name BTQCLC Monitoring Well Installation Project No. 030118*27 <br /> Prepared by Margaret Wild Date 25 January 2017 <br /> Project Manager Alicia Stamps Office SFO <br /> Field Services Description <br /> Field Services Date(s) May 2017 <br /> Site Name Barrel Ten Quarter Circle Land Company, Escalon Winer <br /> Location Escalon, California <br /> Client Site Contact Paul Franzia Site Telephone (209) 272-3276 <br /> Site Activities <br /> ❑ Onsite Inspection or Construction-Related <br /> Services <br /> ❑ Entry into a Confined Space or Excavation' <br /> ❑ Work on an Unprotected Platform <br /> ❑ Work from a Mobile Elevated Work Platform <br /> ❑ Entry into an Excavation or Trench with a Depth of 4 feet or Greater <br /> ❑ Field Investigation Requiring <br /> ❑ a. Entry into (potentially) hazardous area <br /> ❑ b. Interruption of vehicular traffic <br /> ❑ c. Interruption of plant processes <br /> El d. Operation of pilot plant <br /> El Chemical Use' 3❑ <br /> ® Other—_Monitoring Well Installation (Zf Wells) <br /> Completion of Kennedy/Jenks Consultants Confined Space Pre-Entry Checklist and Entry Authorization is required or review <br /> of Client's Confined Space Procedures. <br /> 2 A Field Chemical Use Plan must be completed. Material safety data sheet(MSDS)information and Field Chemical Use Plan <br /> will be developed. <br /> Hazard Appraisal and Recognition Plan Page 1 <br /> ©June 2015 Kennedy/Jenks Consultants <br /> w:loflsvclhealth-saftey\master harp templateldraR master harp templateVn aster harp template june2015.jbedits.jpj edits(5).wp.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.