My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
O
>
120 (STATE ROUTE 120)
>
21801
>
2900 - Site Mitigation Program
>
PR0516259
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 4:01:48 PM
Creation date
4/1/2020 3:39:00 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0516259
PE
2960
FACILITY_ID
FA0012534
FACILITY_NAME
BARREL TEN QUARTER CIRCLE LAND CO
STREET_NUMBER
21801
Direction
E
STREET_NAME
STATE ROUTE 120
City
ESCALON
Zip
95320
APN
20525002
CURRENT_STATUS
01
SITE_LOCATION
21801 E HWY 120
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
186
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• • <br /> KENNEDY/JENKS CONSULTANTS <br /> UTILITY LOCATION & ACKNOWLEDGEMENT FORM <br /> Call 811 for Utility Locate at Least 48 Hours Prior to Work <br /> Project Location: <br /> Project Number: <br /> Project Name: <br /> Planned Start Date of Field Activities: <br /> Kennedy/Jenks Personnel: <br /> Private Utility Locator Name: <br /> 811 Contact Date and Time (48 hours before work begins): <br /> KJ One-Call Contractor ID#(varies by state) <br /> Ticket Number: <br /> Utility Clearance Information <br /> How Were Boring/Excavation Locations Cleared: <br /> Utilities Contacted Utility Contact Utility Contacted Marked <br /> by 811 Number bv Telephone in Field Other Describe <br /> Contact information verified by (K/J Staff): <br /> Scheduled On-Site Meeting Location (if applicable): <br /> Public Utility <br /> Private Utility Locator <br /> Use back of sheet to sketch of identified utilities and proposed boring/excavation locations OR attach figure. <br /> Include north arrow and structures if applicable. <br /> Notes: <br /> Mark all proposed borings and excavations with WHITE paint per APWA Utility Color Codes. <br /> Request locator to mark utilities as required by their standard operating procedures or at least within 25 feet of <br /> boring/excavation, whichever is greater, with paint/flags. <br /> Utility marks are valid for 14 calendar days and must be remarked if work continues beyond 14 days <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.