Laserfiche WebLink
Kennedy/Jenks Consultants <br /> Section 1: Introduction <br /> This Monitoring Well Installation Work Plan (Work Plan) has been prepared by Kennedy/Jenks <br /> Consultants (Kennedy/Jenks) on behalf of Barrel Ten Quarter Circle Land Company (BTQCLC) <br /> for the Escalon Winery (Winery) located at 21801 Highway 120 Escalon, California (Figure 1). <br /> The Winery land applies process water at the Winery under Waste Discharge Requirements <br /> (WDR) Order No. R5-2009-0038. <br /> The Work Plan was prepared for installation of two new monitoring wells and one replacement <br /> monitoring well at the Winery. The two new monitoring wells are intended to monitor <br /> groundwater downgradient of proposed new land application areas (LAA). The replacement <br /> monitoring well replaces upgradient monitoring well MW-6 that has been dry since 2014. <br /> BTQCLC is in the process of preparing documentation for an updated WDR to incorporate the <br /> new LAA into its process water management practices. The two new monitoring wells will <br /> provide groundwater conditions prior to the application of process water on the new LAA. The <br /> existing monitoring well network, existing LAA and proposed LAA are shown on Figure 2. <br /> Monitoring Well Installation Work Plan, Page 1 <br /> Barrel Ten Quarter Circle Land Company, Escalon, California <br /> IISFUGroupsll S-Gro u p W d minW ob1031030118.27_BTQC LC109-ReportslMW-I nstall-WP lnitextdoc <br />